My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 9:05:40 AM
Creation date
6/23/2020 6:57:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018-2019
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2018-2019.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vaporless Manufacturing, Inc. <br />Quality Petroleum Equipment Solutions For Over 20 Years <br />99 LD-2000 <br />Highest Performance, <br />Most Requested Mechanical Line Leak Detector Built Today! <br />• Any Fuel* <br />Alcohols, Biodiesel, Aviation, Gasoli <br />• Any Pump* <br />• Electronic Interface Available <br />• Longest Length Pipeline System* <br />Largest Volume Pipeline System* <br />Integrated Check Valve/ Pressure Relief <br />Field Adjustable Leak Threshold <br />Now Available! Factory Certifications for Installation <br />and Annual Testing" <br />The 99 LD -2000 is the most requested mechanical line leak detector built today. New <br />engineering and the Vrni 2 -year warranty (after installation) make the 99 LD -2000 more <br />attractive to station operators today than ever before. Not only is the 99 LD -2000 less <br />expensive to own, it is faster and less subject to field and line variables than ever before! <br />Integrated In -Line Check Valve/ Pressure Relief <br />A leaking check valve in the turbine, defective submersible pump pressure relief, or a defective <br />bypass valve will allow the line system to depressurize, resetting the leak detector. Drain - <br />back into the tank and thermal contraction will cause vapor pockets to form. Vapor pockets <br />increase the length of time it takes for a leak detector to open to full flow. Pump problems <br />such as these result in slow flow and technical support calls. The resulting service costs and <br />customer dissatisfaction all take away from the bottom line - making money. <br />The 99 LD -2000 Is The Only 2" Mechanical Line Leak Detector <br />Capable Of Holding Line Pressure After The Pump Is Off, <br />Even With Pump Component Wear Or Failure. <br />*See Technical Specifications on last page. <br />**Contact factory for details <br />MEMBER <br />t'E1 U.S. Patent No. 4,966,190 - Designed and Manufactured in U.S.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.