Laserfiche WebLink
Pllot Flying J — 1501 N. Jack Tone Rd., Ripon CA <br />LEG <br />Trenching for conduit! <br />D= Dispenser <br />P= h1D"t0dri) GMMI Panel <br />S= Sereor <br />STP= Tuolne Sump <br />F=Fill Bucket <br />V= Vapor Buck' <br />A=Annular Sensor <br />M=Autametic Tenk Gage <br />TS= Trarsitlm Sump <br />L= Line Leak Detector <br />Product Linea= <br />Vent Lines= "-'--.••"-' <br />Vapor Lines= — <br />CAS= Clean Air SeDerator <br />Vi= Vent Lines <br />Example STP/S/L=Tureinef Smsor/Line <br />Leak Oercmr <br />Proposed modification to SR0078189 <br />S-Conduits to be run on canopy top to avoid <br />disturbing Diesel islands. <br />-Conduits will run from canopy top, down <br />'s columns to dispensers. <br />-No longer trenching at Diesel Islands. <br />-Replacing all Diesel Sensors. <br />to .. ... _ ... " <br />vs <br />w* t <br />l/ 9um0 antl SDiB Bucket <br />a <br />SR0078189 <br />RECEIVED <br />APR 10 2018 <br />Client: <br />Pilot Flying J #618 <br />1501 N. Jack Tone Rd. <br />Ripon, CA 95366 <br />Vicinity Map: <br />0 <br />Scope of Work: <br />-Saw cut and remove concrete at <br />trenching area <br />-Install new underground electrical <br />conduit per code. <br />-Perform pre -backfill inspection. <br />-Backfill and pour concrete back to <br />match existing. <br />-Pull in new 18 awg veeder root <br />interstitial wiring to each location: <br />T1 A, T2 A, T3 A, T4 A, T5 A, T6 A. <br />Dispenser islands: 19, 20, 21, 22, <br />23, 24, 25, 26, 27, 28, 29, and 30. <br />-Connect existing sensors to new <br />wiring. <br />-Perform sensor functionality test. <br />Scale <br />Job #: <br />NTS pilot 618 Ripon- Sensor Wiring <br />JONES COVEY GROUP, INC. <br />9595 L Ranch Rd 4100 <br />Rancho Cucamonga, CA 91730 <br />Office. 1888)972-7581 <br />Contractors License 4804431 <br />Ua-A,B HAZ <br />h <br />n� <br />-Saw cut and remove concrete at <br />,<5 <br />trenching area <br />-Install new underground electrical <br />conduit per code. <br />-Perform pre -backfill inspection. <br />-Backfill and pour concrete back to <br />; <br />match existing. <br />-Pull in new 18 awg veeder root <br />interstitial wiring to each location: <br />T1 A, T2 A, T3 A, T4 A, T5 A, T6 A. <br />"` <br />Vie+/ ......_.. <br />Dispenser islands: 19, 20, 21, 22, <br />23, 24, 25, 26, 27, 28, 29, and 30. <br />-Connect existing sensors to new <br />�eViF�"m �:1 54i X4 <br />�i <br />wiring. <br />v. <br />-Perform sensor functionality test. <br />1 ;- <br />`s <br />Proposed modification to SR0078189 <br />S-Conduits to be run on canopy top to avoid <br />disturbing Diesel islands. <br />-Conduits will run from canopy top, down <br />'s columns to dispensers. <br />-No longer trenching at Diesel Islands. <br />-Replacing all Diesel Sensors. <br />to .. ... _ ... " <br />vs <br />w* t <br />l/ 9um0 antl SDiB Bucket <br />a <br />SR0078189 <br />RECEIVED <br />APR 10 2018 <br />Client: <br />Pilot Flying J #618 <br />1501 N. Jack Tone Rd. <br />Ripon, CA 95366 <br />Vicinity Map: <br />0 <br />Scope of Work: <br />-Saw cut and remove concrete at <br />trenching area <br />-Install new underground electrical <br />conduit per code. <br />-Perform pre -backfill inspection. <br />-Backfill and pour concrete back to <br />match existing. <br />-Pull in new 18 awg veeder root <br />interstitial wiring to each location: <br />T1 A, T2 A, T3 A, T4 A, T5 A, T6 A. <br />Dispenser islands: 19, 20, 21, 22, <br />23, 24, 25, 26, 27, 28, 29, and 30. <br />-Connect existing sensors to new <br />wiring. <br />-Perform sensor functionality test. <br />Scale <br />Job #: <br />NTS pilot 618 Ripon- Sensor Wiring <br />JONES COVEY GROUP, INC. <br />9595 L Ranch Rd 4100 <br />Rancho Cucamonga, CA 91730 <br />Office. 1888)972-7581 <br />Contractors License 4804431 <br />Ua-A,B HAZ <br />