My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 9:05:40 AM
Creation date
6/23/2020 6:57:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018-2019
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2018-2019.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> MAY 0 9 2018 <br /> San Joaquin County <br /> Environmental Health Department oI 1g0N E TAL <br /> �� t�1 MENT <br /> 1868 E. Hazelton Avenue <br /> PROGRAM COORDINATORS <br /> .. t <br /> :. Stockton, California 95205-623 Jeff Carruesco,REHS,RDI <br /> Kasey Foley,REHS <br /> 0Ris` Website: www.sjgov.orglehd Rodney Estrada,REHS <br /> Phone: (209)468-3420 Willy Ng,REHS <br /> Fax: (209)464-3433 <br /> APPLICATION FOR UNDERGROUND STORAGE ANK <br /> RETROFIT OR PIPING REPAIR PERMIT <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the <br /> applicant with comments. <br /> [] 2. Include a detailed site map on a separate sheet of paper showing all work to be done. Include the location of <br /> the tanks(s), piping, ll tank-related appurtenances,streets,adjacent properties(north toward the top of the page), <br /> nearby septic tanks, leachfields, water wells, buildings, underground public utility lines (including water, sanitary <br /> a <br /> sewer and storm sewer), and distance of piping from tank to dispensers. If underground utilities are not included <br /> on the site map,you must state in writing that USA Dig will be contacted prior to excavation activities. <br /> (] 3. Complete pages 3-6, "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR PIPING <br /> REPAIR PERMIT". OTE: if sampling is required sampling firm shall be an independent third nartv from the <br /> contractor performing the work. <br /> (] 4. Complete page 7, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> [] 5.Submit a completed"Service Request"form and"Underground Storage Tank Program Fee Worksheet". <br /> [] 6. If performing any excavation activities, and the facility is located outside of the city limits, submit a "Backfill <br /> Excavation Certificate" as required by the San Joaquin County Building Department. If a "Backfill Excavation <br /> Certificate" is required by any incorporated areas (cities), submit to the appropriate City Building Departments, <br /> pursuant to the Uniform Building Code STD 70-11. <br /> [] 7.The maximum review time for Plan Review is 15 working days from receipt of the adequately completed plan. If <br /> gross deficiencies are identified, an addendum will be required with a $139.00 per hour fee and the review will <br /> begin on the date of resubmittal. <br /> [] 8.Advance inspection notice of at least 48 hours is required by the Environmental Health <br /> Department(EHD). <br /> [] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit (LEL) <br /> atmosphere and oxygen level),adequate number(s)and appropriate type(s)of fire extinguisher(s), and barriers to <br /> secure the area as necessary to minimize traffic and pedestrian interference. It shall be the project manager's <br /> responsibility for compliance with all health & safety regulations and requirements, including confined space <br /> requirements, which shall be strictly adhered to at all times during the course of the underground storage tank <br /> (UST)activities. <br /> I [] 10.The EHD permit shall be on site during all UST permit-related activities. <br /> [] 11.Any changes in this document shall be approved by the EHD prior to initiating work. All changes to any work <br /> must be described in detail on pages 3&4 and be shown on the detailed site map. <br /> EH230038(revised 7-26-2016) 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.