Laserfiche WebLink
Reverse Ratio Piston / Poppet Combination <br /> Reverse Ratio means the leak detector has a smaller diameter piston area than the poppet it is attached to. <br /> This smaller piston area keeps the leak detector in the fast fill position(3 GPM)to a higher line pressure while <br /> compressing vapor pockets and expanding flexible pipes faster. This means less time bafull flow, The leak <br /> detector does not have hocompletely reset (as with competitive leak detectors) for the poppet tobeforced <br /> into the reset mode mtpump atod-up. <br /> Smaller Volume/ Faster Response Piston Size <br /> With a reduced piston size,there is one-fourth the fuel volume to replace when in leak search and one-fourth <br /> the fuel volume to return to the line when the pump turns off.This combination makes for a more responsive <br /> and faster kaeb detector. Less volume to leave the line for the leak detector to reset and catch |aaha. Less <br /> volume to fill and provide full flow for dispensing! <br /> Superior Flex-Pipe Performance <br /> The reduced surface area of the piston significantly reduces the surface area exposed to hydraulic line <br /> shock. This results in enhanced performance with obme| and fiberglass pipe, and especially m»ith today's <br /> flexible pipe. <br /> 99 LD~200OWE <br /> |nthe early 189U'a.the first commercially successful flexible pipe,Total Containment PP-1 500,was introduced <br /> tothe U.8. petroleum industry. Due tothe flexibility ofthis pipe system, noline leak detection would work. <br /> |n1082.the Vnm^ LD-2UOO\Ewas certified for 3GPH@1UPSI onTotal Containment PP-15OOpipe. The <br /> 98 L[-2000\E is abU required for existing PP-1500 pipe. Additionally, today the 8S LD-3000kE is used in <br /> sites that have the same line characteristics as the LD-2000\E was originally certified for, even though the <br /> pipe isdifferent. The original certification of the LD-2000\E concerned the bleed-back modulus of PP�l 500 <br /> pipe. Today, lines with high bleed-back(generally above 600 mi.)and high head pressure may require the <br /> QSLO-200U\Etopass afield test for annual certification. Consult with factory before ordering and installing <br /> the S9LD-20O{8E. <br /> Electronic Line Leak Detection Upgrade! <br /> The 99 LD-2000 may be upgraded in the field to eliminate thermal induced slow-flow, provide submersible <br /> ahut-dmwn.and alarm notification tosite monitoring equipment.Request information onthe US&0-4000.oneasy <br /> upgrade for existing or new installations. The ISM-4080 also stages turbines and controls solenoid valves for <br /> loading racks and marine applications. |fthere ianoneed for staged turbines, solenoid valve control, alarm <br /> notifioobonursubmersible ahut-dmvxn. request information onthe ARk8-4073toeliminate false alarms only. <br />