Laserfiche WebLink
7. Are fill/spill containment boxes presently free of water,debris,and hazardous substances? 39�-PFT 618 <br /> 77 (Um Gar section to row Is as needed) <br /> TRUCK DSI. FBI 0 ❑ U/L 87 Fill Fill Cc] <br /> #1 VR El ■ T#4 VR 09 [1 ❑ SIO DIESEL VR Q9 ❑ ❑ <br /> TRUCK DSL Fill Q§ ❑ U/L 89 Fill cc ❑ Fill ❑ ❑ <br /> T#2 VR ❑ ❑❑� ■�i TM VR 99 0 1 0� E VR ❑ O ❑ <br /> TRUCK DSL FBI 4�� u i i AUTO DTESt. �Flll I u 1 I Fill ❑ ❑ <br /> T#3 VR ❑ ❑ ■J ( T#6 VR ❑ ❑ ■ VR ❑ ❑ ❑ <br /> 8. Are under-dispenser containment(UDC)areas presently free Be. Are UDC probes presently properly located(i.e.,at lowest point <br /> of water,debris,and hazardous substances? in sump)? <br /> (Use Carmel Commarts sectio,to txft addftiel deWs as ) (Use schen to note addMonal details as roadeM <br /> 1/2 - AUTO SIDE 99 ❑ 03 ❑ ❑ V DG Br • seo5e f- ®1-- <br /> 3/4 - AUTO SIDE M ❑ ❑ ot ❑ ❑ <br /> 5/6- AUTO SIDE ❑ ❑ ❑ ❑ <br /> 7/8 - AUTO SIDE ❑ ❑ 1A ❑ ❑ <br /> 9/10 - AUTO SIDE ❑ ❑ ❑ ❑ <br /> 11/12- AUTO SIDE ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> 13 - R/V SIDE ❑ ❑ ❑ ❑ <br /> 14/15 - R/V SIS ❑ ❑ ❑ ❑ <br /> 16 - RY SIN ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ m ❑ ❑ <br /> 19 - MAIN&SAT - TRUCK ❑ ❑ ❑ ❑ <br /> 20- MAIN d SAT - TRUCK ❑ ❑ ❑ ❑ <br /> 21- MAIN SAT - TRUCK ❑ ❑ ❑ ❑ <br /> 22 - MAINd SAT - TRUCK ❑ ❑ ❑ ❑ <br /> 23 - MAIN &SAT - TRUCK ga ❑ ❑ ❑ ❑ <br /> 24- MAM4dr SAT - TRUCK P ❑ ❑ ❑ ❑ <br /> 25 - #AMb SAT - TRUCK fA ❑ ❑ ❑ ❑ <br /> 26 - MArN8 SAT - TRUCK ❑ ❑ ❑ ❑ <br /> 27- MAIN8 SAT - TRUCK qa ❑ 1 ❑ 1 ❑ ❑ <br /> 28- MAINb SAT - TRUCK 04 ❑ ❑ 1A ❑ ❑ <br /> 29- MAIN & SAT - TRUCK ❑ ❑ fj ❑ ❑ <br /> 30- MAIN d SAT - TRUCK ❑ ❑ ❑ ❑ <br /> • to <br /> g.Has a Monitoring System Certification been completed within the past 12 months? 99 ❑ ❑ 05-03-2017 <br /> 10.Have the SS M Secondary Containment Tests been completed within the past 36 month? ❑ ❑ 11-01-2016 <br /> 11.Have fill/spill containment boxes been tested within the past 12 months? ❑ ❑ 05-03-2017 <br /> 12.Has precision tank tightness testing(0.1 gph)been completed within the required! ' me? ❑ ❑ ■ OMMPT <br /> 13.Has precision line tightness (0.1 gph)been completed within the required ' e? ❑ ❑ ■ EXEMPT <br /> 14.Have other required tests or maintenance been competed within the required ' s? <br /> Mechanical Line Leak Detector testing? ❑ ❑ 05-03-2017 <br /> Pressurized tine Leak Detector(PLLD or WPLL.D)testing? ❑ ❑ 0 N/A <br /> Vapor Recovery System Re-Verification testing? ❑ ❑ 04-18-2017 <br /> NO <br /> 15. Have all"facility employees"(FEs)responsible to respond to an alarm,overfill,spill or leak been trained by the ❑ ❑ <br /> DO on UST System compliance within the past 12 month? <br /> 16. Have all FEs responsible to respond to an alarm,overfill,spill or leak,hired within the past 30 days recehfed ❑ ❑ Irr <br /> UST system compliance lance train by the DO? �P- <br /> NOTES: Pmvxie expenabom krrany W(r answerer+Me queshons above in the General ComnierdswchonNuft answers Mat have not yet been resolved wW requ6®RODw-to action. <br /> ACach a copy of ft sera HeAvy Reporbtog to Me WC y avabble ff not avallable,expbOwhy min Me Commmb sodion. <br />