My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2300 - Underground Storage Tank Program
>
PR0506004
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 4:07:28 PM
Creation date
6/23/2020 6:57:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506004
PE
2361
FACILITY_ID
FA0007140
FACILITY_NAME
FLAG CITY SHELL*
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506004_6437 W BANNER_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Top <br /> tj 0 o <br /> f • <br /> � I I <br /> Pre-located <br /> anchoring system Product penetration <br /> fittings with secondary <br /> hose termination <br /> • <br /> 12-gauge steel <br /> Powder epoxy <br /> coated paint <br /> 1 1/2"single poppet <br /> product shear valve <br /> Patented float-trip shut <br /> Product valve brackets amplification mechanis <br /> The shallow"Bravo Box"is the world's first and foremost The B-2000's design assures astTng integrity, safety <br /> secondary containment system for dispensers. and low-cost retrofitting when a change in dispenser is <br /> anticipated. <br /> The B-2000,the original shallow Bravo Box,is factory <br /> equipped with the patented Float Trip Amplification Mechanism - UI,listed system <br /> that shuts down the impact valve of the product when approxi- - Rugged steel construction <br /> mately 5-ounces of fuel is captured in the float reservoir.All - Factory pre-tested <br /> remaining dispensers,as well as the other products in the leak- - Fully equipped for contractor-friendly field installation <br /> ing dispenser continue in operation. - Compatible with all fuels <br /> ED]] - - RRMN <br /> 323/888-4133 <br /> BRAVO S. BRAVO SYSTEMS, INC • 2929 Vail Avenue - Commerce - CA - 90040 3�! �' <br /> SYSTEMS Fax: 323/888-4123 - E-mail: info@sbravo.com - http://www.sbravo.com 7fUMEWIPWNTIN4� <br />
The URL can be used to link to this page
Your browser does not support the video tag.