Laserfiche WebLink
10/03/2007 09:42 #0050 P.013 /021 <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN--PAGE 1 ple fbTm pet facility) <br /> TYPE OF ACTION ❑ 1.NEW PIAN 2.CHANGE OF INFORMATION Rtl1. <br /> X. FACILITY INFORMATION <br /> FACILL'IY 1D# (Agency Use Only) <br /> BUSLNF.Ss NaNrls(sameas FACIi rrY1A1wE, <br /> BUSINESS SrrE ADD aCITY F � Rea <br /> q ;-7 W Q rYY?£-✓ 12d OT W I <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and sopplemeats the e=gcncy reVom plans and m the facaitys Hazardous MXetials <br /> Business Plan. <br /> D If safe to do SO,faerlfty personnel will take immediate measures w control or stop any release(e.g.activate pump slstR•ot1;etc)ted,if ,safety remove <br /> za <br /> rantuning hardous tnaterW from the UST systGtn <br /> > Any rekaso to secondary cont mmzcnt will be pumped or otherwise reaoved within a bane consistent with the ability of the secondary containment system to <br /> contain the hazardous matenal,but not greater than 30 calendar days„or sooner if requited by the kcal any, Recovered hazatdow materials,unless still suitable <br /> for their Wended use,will be as hazardous waste. <br /> > Absorbent material will be used to contain and clean up Manageable spills of haratdous Materials. Absorbent material which has becorm too saturated to be <br /> effective or which is no longer intended for use will be as hazardous waste unless a waste dMm6nation in accordance with 22 CCR§66262-11 finds that <br /> it is teen-Hazardous. Used absorbent material,rem-&le or waste.will be stored in a properly labeled and mjcj_oont&jhtM Waste material stall be disposed <br /> appropriately. <br /> Facility peisomet will determine whether any waren retnoved from secondary contatinment system,or from clain-up activity,bas been is contact with any <br /> haratdous mamiaL If the water is commirattak it will be managed as hazardous waste unless a waste daeratkiation in accordance with 22 CCR W262.I I finds <br /> that it is non-hazardonR If the water has a petroleum sheen(ie.,rainbow coioms it is c:ontamirmucd. A thick floating pearoleun layer may not necemntly spay <br /> rainbow colors. WaW O=xdons Or non- )from-mps,spill containers,etc.will not be disposed to storm water systems, <br /> A We will review seamy containment systema for possible if m4'of the following conditions occur: <br /> 1. I material in contact with secondary oOntaii—t is not WIMPSele with the material used for secondary containment; <br /> 2 Secondary containment is prone to daaaetro from arty equipment used to remove or clean up hazardous material oollocied in secondary cwntainmazt; <br /> 3. Flazat'dous material,other than the product/wastc StOt'ed in the pdmmy containment systeut�is placed insi&secondary contsinmeut to treat or ncattratizc <br /> released product/waswe and the added material or resulting Material from such a combinatiod is not companblc with secondary coantintocuL <br /> III. SPILL CONTROL AND CLEAN—YTP EQUIPMENT <br /> PERIODIC blAEVIMNANCE.Spill control and clean-up equipment kept pormanattly on-site is listed iu.the facility's Hazardous Materials Bum Plan. This <br /> equipment is inspected at lc=monthly,and abler each use,supplies aro replenished as nooded, Defeetive equipment is xcpaued or replaced as necessary. <br /> E fl PWN7<NOT PER. VTLY ON-S BUT AV LE FOR USE IF NEEDED; Co cruet if <br /> E4 NT <br /> V � LOCATION AVAILABILT <br /> 1110- <br /> moo. <br /> Ri t. R21. R37. <br /> Rl2 RM R32 <br /> Rb 3. R23. R33. <br /> Rla. ICA. <br /> R34 <br /> RIS. M5. s3a. <br /> IV RESPONSIBLE PERSONS <br /> TRE FOLLOWING PERSONS)WARE RFSPONSLBLE FOR AUMORIZING ANY WORK NECESSARY UNDER THUS RESPONSE PLAN, <br /> TITLE ,^ „� � Rw. <br /> `IAAE1 Rat. �V <br /> Ile -kV <br /> NAME u43TITLExr_ <br /> c S' <br /> NAME Rs3. TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF 1NrrOR1NG WDICATES A POSSIBLE UNAI ORiZED RELEASE.STEPS TO VERIFY THE R bLEASE WILL,BE MADF.AS FOLLOWS: <br /> 149 Additional system testing or data collection tion by qualified pawns ©Recalibration of equipment <br /> -tions] <br /> Rbc. <br /> UST Reuse Fan( -I!3 <br />