Laserfiche WebLink
'0 . <br />Jun 10 11 01:49p <br />D. Results of Testing/Servicing <br />Software Version Installed: <br />(`.mmnlate the fnlinwine checklist_ <br />Elite IV Contactors 12094616342 <br />0 is <br />Yes C No' <br />Is the audible alarm operational? <br />Yes D No' <br />Is the visual alarm operational? <br />Yes D No' <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Yes D No' <br />Were all sensors installed at lowest point of secondary containment and positioned so tha <br />o er operation? <br />❑ Yes 3 No' <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.ci. <br />N/A <br />Yes o No` <br />For pressurized piping systems, does the turbine automatically shut down if the pipir g <br />O N/A <br />detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />C Sump/Trench Sensors; n Dispenser Containment Sensors. Did you confirm pos <br />failure/disconnection? ❑ Yes; ❑ No. <br />Yes F No' <br />For tank systems that utilize the monitoring system as the primary tank overfill warning d <br />yb N/A <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) an <br />of tank capacidoes the alarm trigger? % <br />Yes' ❑ No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probe: <br />t_ " <br />t" <br />manufacturer name and model for all replacement arts in Section E below. <br />C Yes" D No <br />Was liquid found inside any secondary containment systems designed as dry systems? (C <br />es, describe causes in Section E below. <br />Yes D No' <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if <br />Yes u No' <br />Is all monitoring equipment operational per manufacturer's specifications? <br />- In section a oeiow, oescrloe now ana wnen tnese aenciencies were or wm oe correctea. <br />E. Comments: <br />Monitoring System Certification <br />Page 2 of 4 <br />positive shut -down? (Check all that apply) <br />va shut -down due to leaks an sensor <br />rice (i.e. no mechanical overfill prevention <br />operating properly? If so, at what percent <br />other equipment replaced and list the <br />12107 <br />2 2/21/07 <br />