Laserfiche WebLink
I.N. <br />'o¢. 4uF c9 41 <br />oo SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />N: t <br />600 East Main Street, Stockton, CA 95202-3029 <br />;P Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sogov.org/ehd <br />'4�fFOR� <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />FacilityName* <br />�1 4 <br />I l <br />Inspection Date: <br />ca -ill - b <br />Facility Addr s: <br />❑ mechanical Model: <br />Service Request #: <br />11 <br />Onsite Service Technician's Name: <br />ICC Service Tec hn ianllnstaller Exp. Date: <br />Manufacturer Training: <br />7S� R,11-1-11 <br />Leak detector <br />❑ <br />SERVICE <br />I l <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />W= <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />• <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />0-r4f;,64) - <br />❑ <br />dhutdown Model: !!�t <br />❑ <br />;ositive <br />fail safe Serial #: -759'6P:;' <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />SERVICE <br />I l <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />W= <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />• <br />❑ Caldwell System ❑ Other <br />WN <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />. �' �� <br />I l <br />'.'.V <br />W= <br />i 1 <br />, <br />- • +� / <br />AN �. <br />• <br />!�4;5:4,7r�44[&7414 , pis <br />WN <br />EHD 23-04 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />