Laserfiche WebLink
SWRCB, January 2002 <br />:1 <br />0 Page J of & <br />P7 1rjVnF1P_nrcP'FNgVU CnNTATNMF.NT (IJDQ TESTING <br />Test Method Developed By: YL ❑ UDC Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Spec) _ <br />Test Method Used: ❑ Pressure ❑ Vacuum' X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br />UDC # 1&2 <br />UDC # 3&4 <br />UDC # 5&6 <br />UDC # 7&8 <br />UDC Manufacturer: <br />Bravo <br />Bravo <br />Bravo <br />Bravo <br />UDC Material: <br />Coated Steel <br />Coated Steel <br />Coated Steel <br />Coated Steel _ <br />UDC Depth: <br />9" <br />8"9" <br />9 11 <br />Height from UDC Bottom to Top <br />See Comments <br />See Comments <br />See Comments <br />See Comments <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />See Comments <br />See Comments <br />See Comments <br />See Comments <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Dry <br />Dry <br />Dry <br />Dry <br />testing: <br />Portion of UDC Tested <br />Water Lever 8" <br />Water Level 7" <br />Water Level 8" <br />Water Level 8" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />Yes X No ❑ NA <br />Yes X No ❑ NA <br />Yes X No ❑ NA <br />Yes X No ❑ NA <br />product and water)?' <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA' <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />safe shutdown?* <br />Was fail-safe verified to be <br />❑ Yes X No ❑ NA <br />❑ Yes X No ❑ NA <br />❑ Yes X No ❑ NA <br />❑ Yes X No ❑ NA <br />o erational?` <br />- <br />Wait time between applying <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />water and starting test <br />Test Start Time: <br />10:10 <br />10:20 <br />11:15 <br />11:20 <br />Initial Reading (Ri): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />10:40 <br />10:50 <br />11:45 <br />11:50 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes _ <br />in R -R : <br />Change in Read ( F i) <br />g <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />X'Pass ❑ Fail ` <br />X Pass ❑ Fail' <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA, <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />All Penetrations enter from bottom of Bravo system UDUS. _ <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to Any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />