Laserfiche WebLink
ENVIRONMENTAL HEALT DEPARTMENT <br /> °PQUl �o SAN JOAQUIN COUNTY <br /> G Unit Supervisors <br /> Q , :?� Donna K.Heran,R.E.H.S. <br /> Z ;� Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,Douglas W.Wilson, <br /> S.,R.D.I. <br /> R.E.H.S. <br /> c'q s �P Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> �iFda Laurie A.Cotulla,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> December 24, 2002 <br /> TAIT & Associates, Inc. <br /> Attn: Amy Castro-Dy <br /> 2880 Sunrise Boulevard, Suite 206 <br /> Rancho Cordova, CA 95742 <br /> Re: Arco 6347 <br /> 2430 Joe Pombo Parkway(2295 W. Grant Line Road) <br /> Tracy, CA <br /> Closure in Place Conditions: <br /> 1. Contact the fire department for their permit requirements. <br /> 2. Provide the information of slurry mix to be used for the piping closure in place <br /> prior to any work performed. <br /> Installation Conditions: <br /> 1. Contact the local fire department and San Joaquin Valley Air Pollution Control <br /> District for applicable permits. <br /> 2. A third party certified tank integrity test must be performed and results received <br /> prior to <br /> placing the UST back into operation. <br /> 3. A third party certified piping line tightness test must be performed and results <br /> placing the UST back into operation. <br /> 4. All piping and connections shall bear a UL label. <br /> 5. All piping must slope to a containment sump with an audible and visual alarm. <br /> 6. All equipment in contact with backfill must have corrosion protection. <br /> 7. Contact EHD for the following inspections: <br /> a. Primary piping test <br /> b. Secondary piping test <br /> c. Piping slope <br /> d. 24 hour lake test on turbine sumps <br /> e. Final inspection <br /> 8. Any changes in information or scope of work must be submitted to EHD prior to <br /> commencing work. <br /> 9. A final inspection must be performed prior to returning this station to operation. <br /> 10. Submit an As-Built plan to EHD at the time of the final inspection. Note: A final <br /> inspection will not be performed unless the as-builts are submitted. <br />