Laserfiche WebLink
EQUIPMENT LIST " <br /> f <br /> DESCRIPTION MANUFACTURER MODEL f PART/ <br /> Oj 42'DIAIAETER MULTI-PORT SPILL CONTAINMENT MANHOLE&FWNEE POMEDO 521 6571B-EVR- 164042RT052 <br /> 0 0 <br /> 6571G-M- 1643M42R7T,154 lor <br /> 2 PHASE I BRONZE SWIVEL ADAPTER W/OPW/VPN 4.5 NIPPLE OPW 61VSA-EVR B7VSA-1020-EER <br /> 3 PHASE I VAPOR TOP SEAL CAP M OPW 17117-EVR 1711T-7085 <br /> O4 PHASCAST EIRONW/RDRA N�VA�VESPPUIGC OPW�N/ 10K-2100�N POMECO 511 511C•-PEVft r <br /> C N O <br /> 5 FACE SEAL ADAPTER,PHASE I RISER,ATG RISER,&FILL RISER OPW FSA-400 FSA-400 —J a Q •� O <br /> O <br /> FILL BRONZE SWIVEL ADAPTER W/DPW/FPN 4X7 NIPPLE OPW 61SALP-EVR 61SAIP-1020-EVR o•(n Q <br /> �j <br /> FILL TOP SEAL CAP OPW 634TT-EVR 6341T-7085 -. r•> <br /> AAOB LL/EVR DRAIN VALVEENT.5 GALLON CASE IRON, POMECO 511 511C-DEUR ++ a t <br /> ofO 9 ACK SCREW ASSEMBLY IN FILLET LL BUCKDPW 61JSK-4400-EVR 61JSK-4400-EVR 0 0 <br /> m O <br /> �dO� 10 STRAIGHT FILL DROP TUBE OPW 61T 61T-7368 -� E•� a.� <br /> QO -- -- -- 11 FITTING,EXTRACTOR,TEE,4'X4'X3'X3• OPW 233 233VM-4433 0 -+ <br /> 12 TANK GAUGE PORT COMPONENTS(CAP&RING KTI0_) MORRISON BROS. 305XPAl IOOMEVR 305XPAl IOOAKEVR <br /> EXISTING APPROACH Q 13 THREADED PRESSURE VENT CAP OPW 623V 623V-2203 2') c L <br /> 6Z3V-3203 3 0 <br /> 14 NOT USED (n o U Cd <br /> p/ I 15 3'X 12'BALLFLOAT OPW 53WL-3120 53VML-3120 O <br /> / — 16 WATER SHIELD OPW PMWS MPWS-33(33'TOP HAT) _ C) <br /> / TRASH MPWS-36 36'TOP HA <br /> ENCLOSURE 17 RISER SUPPORT OPW 651 1-RB16 651 1-RB16 -1- M <br /> I 1B OVERFILL ALARM WITH HORN/STROBE 120VAC, VR-790081-001 ALARM -Cf) Of <br /> � C4 <br /> u1' I ACKNOWLEDGE SWITCH,&AUTOMATIC TANK GAUGE VEEDER-ROOT VR_84990_o0X TANKCGAUGE 0 (0 <br /> EXISTING <br /> / CANOPY <br /> EXISTING E.S.O. I m Q <br /> U <br /> EXISTING EXISTING I <br /> DRIVE SLAB /^ DISPENSERS ON <br /> ISLAND(TYP.) 0 TJ <br /> / EXISTING ALARM 2'_0' 2'_0• 20'x14'x1/4' z Q.' !` <br /> / ACKNOWLEDGE <br /> / CANOPY COLUMN STEEL PLATE <br /> (TEP.) EXISTING I SWITCH TAINT <br /> ALARMLLMATCHTSITE 00 <br /> O-.. <br /> BUILDING I 6'0 BOLLARD CONDTITONS <br /> T 11 </ V © VEEDEMONITOR SYSTEM-350 l� CONC. <br /> Wl) Q 0 J <br /> ' 0 IL <br /> EXISTING = WP ENOL II(♦I J <br /> TANK SLAB \*\ O I RECEPT.I� Q <br /> a 4'z4'STEEL 1/2' 1­—0 <br /> MATCH SITE TIGHT <br /> NEW OVERFILL ALARM W/ I o \`\ I O POST PAINT TO LIQUID Q <br /> ACKNOWLEDGMENT SWITCH I a // CONDTRONS n Z 0 Z <br /> 10 SEAL-OFF 4•x4• irf <br /> EXISTIN VENT RISERS // I JUNCTION <br /> 7 13 / •L 1'Ras CONDUITBOX ��yy-1�W J <br /> 0 / EXISTIN�jI.C. (�, I FINISHED W— <br /> Z � <br /> / GRADE a0 _J <br /> EXISTING FILL SUMP(TEP.) / W <br /> 1 5 2 6 3 8 411 �/ EXISTING DOUBLE WALL 42'MANHOLE {- M811C.ONC1 <br /> N Z Z ~ <br /> UNDERGROUND STORAGE TANKS I 3 PHASE I CAP ZINTERSifiLAL MONITOR(7YP.) EXISTING TURBINE IL GP 2 PHASE 1 �QSUMP(TW.) ROADA�ELL (1bITPVCFILL ROTATABLE CONOUIf �/NADAPTER 16 BY G. (P,P) G <br /> -- � EXISTING APPROACH - __ -- © \W() <br /> FILL 5 GALLON 4 P 1 5 2 OVERFILL ALARM N.Ts <br /> SIDEWALK BUCKET(W/ GALLON UCNL Q U <br /> DRAIN VALVE) BKET(NO L <br /> © DRAIN VALVE) • Al ;i >'t m N <br /> JACK SCREW 12 ATG <br /> CCAP AND ;t" :1'.y,'V LL(V I— Z) <br /> I.D.SIGN ASSEMBLY KIT <br /> GRANT LINE ROAD 5 FACE SEAL Aly.•, <br /> ADAPTER :•�=r.- : <br /> FACE SUL 11 EXTRACTOR <br /> FITTING Cg n <br /> 5 (BEYOND) 0 <br /> �7 m <br /> l� 4'x12'L BLACK F <br /> RISER UPPORf STEEL.RISER W/ MWjZm <br /> 17 PIPE CAP .4m�p <br /> n <br /> ; <br /> < 'O <br /> 7 s BALL FLOAT EXTRACTOR 0 D ! <br /> STRAIgiT VALVE LOCATED FITTING <br /> DROP TUBE CAPACITY <br /> INSTALLATION NOTES: 1D —SET AIARM BALL FLOAT VALVE 3Zw <br /> BEFORE START OF SAW CUTTING, REMEASURE TO CONFIRM THAT EXISTING MANHOLE FRAME IS NOT COMPATIBLE ®90S LOCATED AT 95% q4Z <br /> WITH NEW MANHOLE LID.IF LID IS COMPATIBLE,DO NOT CUT UNTIL FIELD ENGINEER HAS CONFIRMED A NEED TO 18 CAPACITY moo <br /> X <br /> REPLACE MANHOLE FRAME 10' 0 10' 20' 30' 15 NOJa4w <br /> Q7 CONTRACTOR TO SAW CUT 6'X 6'MINIMUM SECTKINS OF EXISTING TALK SUB AT EACH MANWAY AS SHOWN. 4 P ACTION <br /> GRAPHIC SCALE <br /> Q2 CONTRACTOR REMOVE EXISTING FILL SPILL BUCKETS.REMOVE EXISTING DROP TUBE FLIPPER VALVE(IF ANY), e <br /> AND ANY NON--EVR BALL FLOATS. � AS BUILT NOTE <br /> CONTRACTOR TO INSTALL NEW EVR SWIVEL RISER ADAPTERS AND THREADED NIPPLES AT EACH VAPOR&FILL RISER. THIS SITE PLAN HAS BEEN PREPARED WITHOUT <br /> (4 CONTRACTOR TO INSTALL NEW 5 GALLON SPILL CONTAINMENT BUCKETS AND MANHOLE W/FRAME AT EACH TANK BENEFIT OF TITLE REPORT, SURVEY, OR LEGAL consultant job/ <br /> FILL EVR VR-102-8 COMPLIANT.INSTALL NEW WATER SHIELD AND RISER SUPPORTS AT EACH FILL SUMP. DESCRIPTION. DRAWING REFLECTS EXISTING SITE STAGE I VAPOR RECOVERY & 08933 <br /> (I)CONTRACTOR <br /> CONDITIONS AS MEASURED. 1 FILL DETAIL (GASOLINE) 3 TYPICAL TURBINE ELEVATION N.r.s, ma.1.r nI. dal. <br /> 5 CONTRACTQR TO INSTALL NEW FILL DROP TUBE AND BALL FLOATS AT EACH TANK.EVR VR-702-8 COMPLIANT. CONDITIONS <br /> ©CONTRACTOR TO INSTALL NEW RISER COMPONENTS AT EXISTING TANK GAUGE RISERS.FIELD VERIFY EXACT RISER NO. - BP WEST COAST PRODUCTS,LLC MASTER REVISIONS P.V d.f. arcwnr by <br /> LOCATION.EVR VR-102-B COMPLIANT. Underground Service Alert <br /> 12/10/03 AL <br /> O CONTRACTOR TO INSTALL NEW PRESSURE VACUUM VENT VALVE AT EACH GASOUNE VENT RISER. nitonElerrEllr 1Mo wENruL VlroltlLLYWx N0. DATE REVISIONS 711' PROJECT RELEASE Fli.nom• <br /> (CONTRACTOR TO FIELD VERIFY QUANTitt)EVR VR-102-8 COMPLIANT.SEE ITEM/13 ON EQUIPMENT UST. TMs DOCUMENT AND TME IWORMATION HERON REATINO TO FRED FIEDLER 1/07/ REV.EQUIP.CHANGE PER BP w _ _ <br /> Call: TOLL FREE AID ASS IAIES AND a3 WENT HAS BEEN F1ARNI IN CONFIDENCE FM PERMIT 12/10/03 <br /> (a)CONTRACTOR TO PATCH ALL REMOVED CONCRETE TO MATCH EXISTING. ltY ) <br /> 1-800 <br /> THE PRIVATE MSE OF AURWRRED PER9°NNFl NO PARE HEREOF SHALL fQ Fadl Pro.af <br /> FUELING 12 COPIED, DUPMATED. DSIMBMTED, D6m.ORED OR MADE AVAAABLE TO <br /> �9 NOT USED ORmR3 OR MEED TO ANY EI°ENT VfHA,wEVER EXCEPT AS ExPRES4Y BID 06347 <br /> 227-2600 POSRIONS AUTHORIZED IN WRITM BY FRED FOUR AND A IAIEB AND ITS WEU. <br /> ANY PDSON,FNM OR COMIMAT1ON RECEIVING THIS DOOLAffNr, HOWEVER <br /> 10 INSTALL NEW VEEDER-ROOT OVERFILL ALARM W/ACKNOWLEDGMENT SWITCH AND NEW AUTOMATIC TANK MI51wt BY VIRAIE HEREOF BE DEEMED TO HAVE AOREED TO THE ihM nam. <br /> GAUGING IF NOT EXISTING. NOZZLES 12 FMEGaW RE5rFX 04L CONST <br /> <aD CONTRACTOR TO INSTALL NEW RISER OFFSET AT VAPOR RISER TO OBTAIN 16'O.C.FOR FILL AND 0 TK 1 -1 <br /> VAPOR RISERS.(WHEN EXISTING IS LESS THAN 16'O.C.ONLY) <br /> TWO WORKING DAYS BEFORE YOU DIG As-BUILT <br />