Laserfiche WebLink
a Page Of <br />OENT TESTING <br />Industry Stas Professional Engineer <br />Vacuum Hvdrostatic <br />ment Resolution: <br />n#nn7MW UDC # <br />Portion of UDC Tasted° <br />ir+► <br />SWRcB, January 2002 <br />7. ER Y2ISPENSER CSG <br />Test Method Developed By: <br />UDC Manufacturer <br />Mor ('�'pec51) <br />Tact Method Used: <br />Prowure <br />192 Yes No NA <br />otherS�c� <br />Was fait -safe verified to be <br />#Ta511R1qu*1p1On1*1Us"ed1,: <br />Z <br />Wait time between applying <br />pre=ue/vwuunWwatet and <br />UDC <br />y <br />Heigh from UDC Bottom to Tap <br />' <br />Test Start Time: <br />of FI est P' Pone . <br />Initial Road' <br />Helot from UDC DOUDm to <br />Test End Time: <br />Lowest Eleetrioal Penetration: <br />Final <br />Condition of UDC prior to <br />Csba� <br />a Page Of <br />OENT TESTING <br />Industry Stas Professional Engineer <br />Vacuum Hvdrostatic <br />ment Resolution: <br />n#nn7MW UDC # <br />Portion of UDC Tasted° <br />ir+► <br />Does turbine shut down when <br />UDC swiw dot" liclttld <br />No NA Yes No NA Yea No NA Yes Na NA <br />and water 7` <br />!l -Ams shutdown rospomtime <br />I$ system programmed for fall -NA <br />192 Yes No NA <br />safe Obutdown? <br />Was fait -safe verified to be <br />WiP No NA Yes No NA Yes No NA Yea No NA <br />o tional?• <br />Wait time between applying <br />pre=ue/vwuunWwatet and <br />cv a -• a <br />Stutiag fast <br />Test Start Time: <br />• t'S" <br />Initial Road' <br />`l <br />Test End Time: <br />Final <br />Teat Duration: <br />I t V—o.. "^ <br />Test Result. O PMM WFAU 1 ❑ Paso ❑ Fag 0 PON ❑ Fall ❑ Psss ❑ Fall <br />Was sensor removed far tesW No NA Yes No NA Yes No NA Yea NO NA <br />Was sensor Properly raPieced and <br />VKW84 Amcdonal after t � No WA Yes No NA Yes No NA Yes No NA <br />Comments — rnclude Wormation on repairs made Prior to lesthw and recommended follow-vn 06r failed parte) <br />t If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (') is "NO" or "NA", the entire UDC must be tested, (See SWRCB LG -160) <br />. 1Il <br />