My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I If the entire depth of the UDC is not tested, specify how much was tested. If the answer to An of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />SVMCB, JanUary 2002 <br />Page <br />of <br />7. DISPENSER C2 Ai"ff:NT <br />TESTING <br />Test Method Developed By: <br />UDC Manufacturer <br />Stan Profeusiop$1 Engineer <br />Other (Sped, fy) <br />Test Method Used: <br />Pressure <br />Vacmun <br />Other (Specs, fy} <br />Test nt Usod: Lts 1�1. <br />Equipment Resolution: <br />UDC # t U <br />UDC # l t <br />UDC # <br />UDC # <br />e UDC Manufacturer <br />e UDC Material: <br />' `Ss <br />► woe <br />i/^w f <br />FI <br />Height from UDC Bottom to Top <br />of Highest Piping PcMtration: <br />'tr^t1s <br />(� = kG <br />t Z a +z c-�-.d s <br />�- •. 4sh <br />Height from UDC Bottom to <br />LOWCA Electrical Pis OUVAon• <br />( t `t ,. <br />G / 1 c-:•c� <br />Condttlon of UDC prior to <br />Peroses of UDC Torted <br />Does turbine shut down when <br />UDC sensor detects liquid (bothYes <br />No NA <br />`_ �/ No NA <br />No' NA <br />.t: No <br />NA <br />and water)? <br />iao sliutdaWtxEsa2m baro <br />Tart69 <br />G. <br />5- G, <br />Is systam programmed safe shutdown?, for flail- <br />es N, NA <br />No NA <br />No NANO <br />NA <br />Was -fail-safe verified t0 be <br />NO NA <br />No NA <br />No NA <br />No <br />NA <br />Wart tune between applying <br />pressu V1Vacaum/weter and <br />1 v <br />. <br />('(s 6� ti N <br />L U tA..6 rw <br />CI Y�.. 6 r► <br />SwLting test <br />Test Start Tisa: <br />y. t / <br />;',� <br />14--11 <br />r,- <br />Initial <br />! . 4 <br />62,177-1 <br />'7 G <br />/. Q <br />Test Pud Time: <br />FfiW <br />1 L 3'N <br />-Z, 3 <br />Test Duration: <br />f T *w%',^ <br />I <br />0 r+.. i, <br />!' —0" t o <br />amgc inRAaft® <br />�. <br />. a <br />/ <br />Pass/Fall Threshold or Criteria: <br />Ac> <br />Tc$t R"Rit: <br />D Paan jM9 <br />I Pass t] Fall <br />0 Pass OFalt <br />Pass ❑ Fath <br />Was sensor removed for <br />No NA <br />m NA <br />No NA <br />X07 ISO <br />NA <br />Was sensor property reploced and <br />fig <br />verified wdonal after <br />No NA <br />No NA <br />No NA <br />1-39 . <br />NA <br />Comments — ttrctude ormaWon on rgairs tirade for to testits acrdtow 5 or acted teats <br />re� C K tntsE <br />4k.-.V/ stwa <br />� /Ob fir. &4q4� Ove i <br />etw� <br />I If the entire depth of the UDC is not tested, specify how much was tested. If the answer to An of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.