My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 L1 UL IU.Linns r1XV1Y1 <br />nzAll UVIVaInuijI1V11 <br />rU4 <br />S WRCB, January 2002 <br />Page ®f <br />6. PIPING <br />S IN <br />Test Method beveiopsd By: <br />Sump Manufacturer <br />In Standar <br />Professional Engineer <br />Other (Spe015) <br />Test Method Used: <br />Pressmv <br />Vacuum <br />yc rosi . c <br />Other Aleco) <br />Test Equipment Used. <br />Resolution; <br />Sump # `7 MVI,.;,% <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter: <br />u. <br />Sump Depth: <br />Sump Material: <br />Height from Tank Top to Top of <br />EiPIRS Peaaetratiow <br />Height from Tank Top to Lowest <br />Electrical P <br />- <br />Condidon of sump prior to testing: <br />Portion of Sump Tested' <br />S <br />Does turbine shut down when <br />Gump sensor dctcoo liquid (both <br /><VP No NA <br />Yes No NA <br />Yes <br />No NA Yes No <br />NA <br />roduct and water)2 <br />Turbine shutdown response time <br />Is dem programmed for fail-safe <br />• <br />shutdown? <br />40 No NA <br />Yes No NA <br />Ye s <br />No NA Yes No <br />NA <br />Was fail-safe verified to be <br />'Ondl?° <br />Ws No NA <br />Yes No NA <br />Yes <br />No NA Yes No <br />NA <br />Wait time between applying <br />pressuzWvacuumtWater and sWft <br />t r M d1, <br />test: <br />Test Start Time: <br />13%, y j <br />Initial Reading W.- <br />j 'J <br />Test End Time: <br />Fina! Reading (RF): <br />Test Dumdon: <br />` <br />Change in Reading (RI Its): <br />a C56T <br />Pass/Fail M"Shol4 or Criteria: <br />_!Ki i_ <br />Test <br />❑ Pane Arvan <br />0 Pass ❑ Fall <br />❑ Pass <br />a Fall D PA!" 11 FAIL <br />Was sensor romoved for testing? <br />a%D NO NA <br />Yes No NA <br />Yes <br />No NA Yes No <br />NA <br />Was sensor properly replaced and <br />verified functional after testinaL <br />No NA <br />Yes No NA <br />Yue • No NA Yes No <br />NA <br />Comments —(include information on repairs made prior to resfiny, and recommended fdllpta�up fpr fo W tests) <br />": L G!d "3 a <br />A-z- ! Aicfd Otty^ <br />z <br />I2 <br />' if the entire depth of the sump is not tested, specify how much was tested, If the answer to any of the questions indicated with M <br />asterisk (") is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.