Laserfiche WebLink
SWRCB,January 2002 <br />s Page of <br />S. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />Piping Manufacturer <br />other f3'1 <br />tray Staid Professional Engineer <br />Test Method Used: <br />Other (spWily> <br />Vacuum Hydrostatic <br />Tat Fquiprnent Used: : <br />Piping Motet isi: <br />Piping Run Piping Run <br />Equipment Resolution: <br />Piping Rao # Piping Ran <br />piping Manufacturer: <br />piping Diaxuetor_ <br />N <br />Length of Piping Rue: <br />Product Stored: <br />&#7lJGre Ii.� <br />Method and location of <br />- .tut isonation• <br />Wart time between Opp <br />plegSltre/YeCU and <br />, <br />IV W l (n <br />Teat Start Time: <br />t: 54 <br />Initial Reading W-. <br />5- ( , "v <br />Test End Titne, <br />(o: " <br />Pinel Reading (RF): <br />Test Dttratloix <br />Ze r <br />change 3n Reading (Rg-Rt)• <br />pasapan Threshold or <br />ca: <br />l6� <br />Test Reettlt: <br />D Pon ,(Toll D Pass <br />a Fail O Pass C] Fail 0 Pass El <br />Comments —(include information an repairs niaAr prior to to snot& <br />and recvm follow-z(p for failed tests <br />