Laserfiche WebLink
Paee 3 nf 7 <br />1/13/2003 \o\ <br />G <br />O Soe PoMbC PtCWy <br />SECONDARY PIPE TESTING t�C O C A <br />Test Method Developed By: <br />-.Piping Manufacturer <br />0 Other (Spec) <br />$Q Industry Standard D Profeksional Engineer <br />Test Method Used: <br />[Pressure <br />❑ Other (Spec) <br />Cl Vacuum O Hydrostatic <br />Test Equipment Used: 3.5 <br />Z K GV1 <br />Equipment Resolution 0. ?k PSI <br />T <br />Piping Material: <br />Piping Run # ,S i .' Piping Run # V Piping Run # Piping Run # <br />�= <br />Piping Manufacturer: <br />%, O S <br />Piping Diameter. <br />4 1 iia C ti <br />Length of Piping Run: <br />10veeb <br />Product Stored: <br />$ (jytt GLdG <br />Method and location of <br />• i,a run isolation: <br />R a u.c.e` Ccts <br />P i i iA "J am P C <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />IS M i (&t e 5 <br />Test Start Time: <br />9 °)t AM <br />Initial Reading (R4): <br />5:+ P S i <br />Test End Time: <br />j 6 AM <br />Final Reading (RF): <br />rj 1{- P S'L <br />Test Duration: <br />, (-x - <br />Change in Reading (RF -R j): <br />O p S 1 <br />pass/Fail Threshold or <br />Criteria: <br />P S L <br />T"est`Resicti. <br />_ <br />J'D4'Pass�� <br />^.,�•• �i e:•-�-'='•=ice"' �;�. <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Paee 3 nf 7 <br />1/13/2003 \o\ <br />