My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., ,,, . � ..v . a . �•�-• • •��•�. aaa, as„ v„vaaavva av,a i V <br />Y <br />SWRCB, January 2002 <br />h. page '3 . _ of <br />Test Method Developed By: Sump Manufacturer f i use -Stan and Professional Engineer <br />Other (Spew) <br />Test Method Used: Pressure Vacuum Jrusl. tic <br />Other (.Specl%y) <br />Test Equipment Used: jala <br />Sump Diameter: <br />7 <br />Sump N 6-7 <br />t <br />Sump # <br />Equipment Resolution: <br />Sump # Sump # <br />Sump Depth: <br />Sump Material: <br />-FAP <br />Height from Tank Top to Top of <br />Hi st Piping Penetration: <br />L. <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />(y <br />Portion of Sump Tested' <br />j <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />roduct and water ?' <br />No <br />NA <br />Yes No NA <br />Yes <br />No NA <br />Yes No NA <br />Turbine shutdown response time <br />Is system programmed Cor fall -sate <br />shutdown?' <br />No <br />NA <br />Yes No NA <br />Ycs <br />No NA <br />Yes No NA <br />Was Fail-safe verified to be <br />operational? <br />_ No <br />NA <br />lies No NA <br />Yes <br />No NA <br />_ <br />Yes No NA <br />Wait time between applying pressure/vacuum/water and starting <br />test: <br />'c^ a h <br />Test Start Time: <br />s; <br />initial Reading (Rj): <br />^z . <br />Test W Time: <br />Final Reading (RF): <br />c, <br />Test Duration: <br />Change in Reading (RrRt): <br />Pass/Fail Threshold or Criteria: <br />Teat Result: <br />O Pass &Fail <br />® Paas U Fail <br />a Pasta <br />© Fall <br />D Pass D Fall <br />Was sensor removed for testing? <br />es No <br />NA <br />Yes No NA <br />Yes <br />No NA <br />Yes No NA <br />Was sensor properly replaced a <br />verified functional atter testis ? <br />�v a. No <br />NA <br />Y� No NA <br />Yes <br />No NA <br />Yes No NA <br />Comments — (include tbrmdlion on repairs toode ILrior to testing, and reconinoettded folloiv-un jjr foiled tgstt <br />'if the entire depth of the sump is not tested, specify how much was tested, tf the answer to mt of the questions indicated with all <br />asterisk (0) is "NO" or "NA". the entire sump must be tested. (See SWKCB W-160) <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.