Laserfiche WebLink
E <br />E <br />SWRCS, )anuaty 2002 page .Z-. of 7. <br />6- PIPING SUMP T G <br />Test Method Developed By: Sump Manufacturer industry StaQs3;r Professional Engincer <br />other (Specify) <br />Test Method Used: Pressure Vacuum C4ZA r <br />Other (Spee) <br />- —.- _ Eouioment Resolution: <br />Sump #g7Wi"+t-- <br />Sump Diameter: t ii 4 4 <br />Sump a Sump P <br />Sung► tt <br />Sump Depth: •7 <br />Sump Material: P <br />Height from Tank Top to Top of Z . <br />Highest Pi in Penetration: <br />Height froth Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Teased' f itrt» Nat i�' <br />Does turbine shut down when <br />sump sensor detects liquid (both No NA <br />product and water ?° <br />Yes No NA Yes No NA <br />Yes No NA <br />Turbine shutdown response time S• G. <br />Is system programmed for fail-safe No NA <br />Shutdown?0 <br />Yes No NA Yes No NA <br />Yes No NA <br />Was fail.,afe verified to be No NA <br />o tional?' <br />lies No NA Yes No NA <br />Yes No NA <br />Wait time between applying <br />pressum/vacuutn/water and starting w+r h - <br />test: <br />Test Start Time: V '7 <br />initial Reading (Ri). 4- <br />Test End Time: SZ <br />Final Reading (RP): 4 . t Z Y - <br />Test Duration: t a"; on - <br />Change in Reading (RP -Rt): , 00 <br />Pass/Faii Threshold or Criteria: Qu7z <br />Teat Result &rpass t7 Fail <br />0 Pass 0 Rail D Pass D Fall <br />❑ Pass D Fail <br />Was sensor removed for testing? Jys No NA <br />Yes No NA Yes No NA <br />Yes No NA <br />W" sensor properly replaced and No NA <br />verified functional atter testin 7 <br />Yes No NA Yes No NA <br />Yes No NA <br />' if the entire depth of the sump Is not tested, specify how touch was tested. If the answer to ay of the questions indicated with art <br />asterisk (4) is "NO" or "NA". the entire sump must be tested. (See SWRCB GG -160) <br />