My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />E <br />SWRCS, )anuaty 2002 page .Z-. of 7. <br />6- PIPING SUMP T G <br />Test Method Developed By: Sump Manufacturer industry StaQs3;r Professional Engincer <br />other (Specify) <br />Test Method Used: Pressure Vacuum C4ZA r <br />Other (Spee) <br />- —.- _ Eouioment Resolution: <br />Sump #g7Wi"+t-- <br />Sump Diameter: t ii 4 4 <br />Sump a Sump P <br />Sung► tt <br />Sump Depth: •7 <br />Sump Material: P <br />Height from Tank Top to Top of Z . <br />Highest Pi in Penetration: <br />Height froth Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Teased' f itrt» Nat i�' <br />Does turbine shut down when <br />sump sensor detects liquid (both No NA <br />product and water ?° <br />Yes No NA Yes No NA <br />Yes No NA <br />Turbine shutdown response time S• G. <br />Is system programmed for fail-safe No NA <br />Shutdown?0 <br />Yes No NA Yes No NA <br />Yes No NA <br />Was fail.,afe verified to be No NA <br />o tional?' <br />lies No NA Yes No NA <br />Yes No NA <br />Wait time between applying <br />pressum/vacuutn/water and starting w+r h - <br />test: <br />Test Start Time: V '7 <br />initial Reading (Ri). 4- <br />Test End Time: SZ <br />Final Reading (RP): 4 . t Z Y - <br />Test Duration: t a"; on - <br />Change in Reading (RP -Rt): , 00 <br />Pass/Faii Threshold or Criteria: Qu7z <br />Teat Result &rpass t7 Fail <br />0 Pass 0 Rail D Pass D Fall <br />❑ Pass D Fail <br />Was sensor removed for testing? Jys No NA <br />Yes No NA Yes No NA <br />Yes No NA <br />W" sensor properly replaced and No NA <br />verified functional atter testin 7 <br />Yes No NA Yes No NA <br />Yes No NA <br />' if the entire depth of the sump Is not tested, specify how touch was tested. If the answer to ay of the questions indicated with art <br />asterisk (4) is "NO" or "NA". the entire sump must be tested. (See SWRCB GG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.