Laserfiche WebLink
.a, ..ve. iv.c..=*. •.�__ <br />SWRCB, January 2002 <br />&aULIIv VVIi=J181VWAIV11 IU0 <br />Page of <br />g. SECONDARY PIPE TESMG <br />Test Method Developed By: <br />Piping Manufacturer <br />rakher i15') <br />ustry Stan Professional Engineer <br />Test Method Used: <br />4e9pW <br />Oduw gpegfy) <br />Vacuum Hydrostatic <br />Test Equipment Used: t <br />Piping Material: <br />-,gyp( <br />Piping Run # Piping Rab <br />Equipment Resolution: <br />Piping Run # Piping Ran tt <br />Piping Manufacturer: <br />Piping Diameter <br />M <br />Length of Piping Itu11: <br />ord <br />Product Stored: <br />"j 0C.4" A.c, <br />Method and location of <br />p!pin&.run isolation: <br />a iv. 5,•�-� <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />-/V W t H <br />Test Start Time: <br />t 31► <br />Initial Reading N): <br />Test End Time.- <br />ithe:Final <br />FinalReading (RF): <br />Test D Ovation: <br />k r <br />Change in Reading (Rr &): <br />Pass/Fail Threshold or <br />CAteria: <br />Tat Rmtlt: <br />D ftm Airait 0 Pass <br />0 Fait 0 Pala 0 Fall Ci Pius 0 l�It <br />Comments — (include in <br />formation an repairs madeprior to testing <br />and recommenckd follotiwup for f4 i;kd tests) <br />.12 .. ® u 1 <br />