My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.a, ..ve. iv.c..=*. •.�__ <br />SWRCB, January 2002 <br />&aULIIv VVIi=J181VWAIV11 IU0 <br />Page of <br />g. SECONDARY PIPE TESMG <br />Test Method Developed By: <br />Piping Manufacturer <br />rakher i15') <br />ustry Stan Professional Engineer <br />Test Method Used: <br />4e9pW <br />Oduw gpegfy) <br />Vacuum Hydrostatic <br />Test Equipment Used: t <br />Piping Material: <br />-,gyp( <br />Piping Run # Piping Rab <br />Equipment Resolution: <br />Piping Run # Piping Ran tt <br />Piping Manufacturer: <br />Piping Diameter <br />M <br />Length of Piping Itu11: <br />ord <br />Product Stored: <br />"j 0C.4" A.c, <br />Method and location of <br />p!pin&.run isolation: <br />a iv. 5,•�-� <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />-/V W t H <br />Test Start Time: <br />t 31► <br />Initial Reading N): <br />Test End Time.- <br />ithe:Final <br />FinalReading (RF): <br />Test D Ovation: <br />k r <br />Change in Reading (Rr &): <br />Pass/Fail Threshold or <br />CAteria: <br />Tat Rmtlt: <br />D ftm Airait 0 Pass <br />0 Fait 0 Pala 0 Fall Ci Pius 0 l�It <br />Comments — (include in <br />formation an repairs madeprior to testing <br />and recommenckd follotiwup for f4 i;kd tests) <br />.12 .. ® u 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.