My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARC,01�� r s <br />y p <br />S. <br />Test Method Developed By: <br />-.Piping Manufacturer <br />O Other (Spec) <br />14 Industry Standard ❑ Profeisional Engineer <br />Test Method Used: <br />;LPressure <br />❑ Other (Spec) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: 3.5 <br />F <br />Piping Material: <br />I h CV Ct Equipment Resolution: 0.'), P S T <br />Piping Run #Ij j'j!kOj Piping Run #^+` Piping Run # Piping Run # <br />j= <br />Piping Manufacturer: <br />N-0 S m: rt Lti <br />Piping Diameter, <br />4 1 V% ct, <br />Length of Piping Run: <br />!OFeet <br />Product Stored: <br />$! O od ade <br />Method and location of <br />piping -run isolation: <br />a me a Cots <br />P e j V1 G UM Q <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />)s M i Yl (&t e S <br />Test Start Time: <br />9! if AM <br />Initial Reading (Rj): <br />5. q, P S I <br />Test End Time: <br />6 APA <br />Final Reading (RF): <br />5.+ PS'[Test <br />Duration: <br />, CI.r <br />Change in Reading (RE Rj): <br />O,o P S i <br />Pass/Fail Threshold or <br />Criteria: <br />_ <br />Tess Resatt. :.... . <br />;` :.;Pass::::❑.Fait.:::: <br />- a <br />_ s0:e Pas <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Paee 3 of 7 <br />1/13/2003 <br />\0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.