My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />OW <br />Test Method Developed By: Sump Manufacturer Industry Sta Professional L"•ngineer <br />Other (5 eco) <br />Test Method Used: Pressure Vacuum <br />Other (Steew) <br />Test Equipment Used: :;an Lp <br />Equipment Resolution: <br />Sump #1;,7 V4^jsiC0- Sunep q <br />Sump k SU fill) N <br />Diameter: td1 4 <br />r!u <br />Depth: 7 <br />Sump Material: P <br />Height from Tank Top to Top of <br />Hi hest Piping Penetration: z•• <br />Height froth Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: &Aj <br />Portion of Sump Tested° *1`_ 0.1-r <br />Does turbine shut down when <br />sump sensor detects liquid (both 45P No NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />roduct and water)? <br />Turbine shutdown response time $' e,. <br />Jr. system programmed for fail-safe No NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />shutdown?" <br />Was fail-safe verified to be Xp No NA <br />lies No NA <br />Yes No NA <br />Yes No NA <br />o erational?' <br />Wait time between applying <br />pressure/vacuum/water and Starting W; t vq , <br />test: <br />Teat Start Time: <br />Initial Reeding (Rt): O. <br />Test End Time: • °SZ <br />Final Reading(Ra): Amgen.1ZI/ <br />_. <br />Test Duration: <br />Change in Reading (RP -Rt): , vo <br />PaWFall Threshold or Criteria: d Z <br />Test Result: Lrpass Cl Fall <br />Cl Pass 0 Fail <br />❑ Pass 0 Fail <br />❑ Puss ❑ Fail <br />Was sensor removed for testing? Na NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Was sensor properly replaced and No NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />verified functional after testing? <br />° if the entire depth of the sump is not tested, specify how much was tested. if the answer to int of the questions indicated with an <br />asterisk 0) is "NO" or "NA". the entire sump must be tested. (See SWRC13 LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.