Laserfiche WebLink
VV iU VV ii•iV+\ir+ ai\V111 iDylyD• VVDtV liAVVi iVl9 <br />SWRCB, January 2002 <br />1 U t <br />Page 3,- aft_ <br />6. PIPING SUMP TESTI G r" ' <br />Test Method Developed By: Sump Manufacturer 'ndLwry-Stua6rd Professional Engineer <br />Other (Spee669 <br />Test Method Used: Pressure Vacuum drust:ttic <br />Other (Specify) <br />Test Equipment Used: <br />Sump Diameter, <br />Sump N,5-1 <br />r <br />Sump # <br />Equipment Resolution: <br />Aaa <br />Suntir # Sump It <br />Sump Depth: <br />Sump Material: <br />jEfT <br />Freight from Tank Top to Top of <br />Highest Piping Penetration: <br />L �. <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />3 4 . <br />Condition of sump prior to testing: <br />(Ivolld_ <br />Portion of Sump Tested' <br />i <br />Does turbine shut down when <br />sunup sensor detects liquid (both <br />product and water ?' <br />No <br />NA Yes No NA <br />Yes <br />No NA <br />Yes No NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?* <br />No <br />NA Yes No NA <br />Yes <br />No NA <br />_ <br />Yes No NA <br />_ <br />Was fail-safe verified to be <br />G rational? <br />. No <br />NA Yes No NA <br />Yes <br />No NA <br />Ycs No NA <br />-- <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />1 S—W i h <br />— <br />-- <br />Test Stats Time: <br />r; <br />initial Reading (R,): <br />•Z .y Q <br />Test End Time: <br />Final Reading (RF): <br />c, <br />Test Duration: <br />Change in Reading (RF -R,): <br />r <br />Pass/Fail Threshold or Criteria: <br />Teat Result: <br />❑ Paas AFRiI <br />O Pass O Fail <br />El Pass <br />C] Fall <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />es No <br />NA Yes No NA <br />Yes <br />No NA <br />Yes No NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />Yc No <br />NA Yes No NA <br />Yes <br />No NA <br />Yes Na NA <br />Comments — (include hL/orrnution on repairs made ILHor to testing, and recollNnelided follotu-tar fpr foil,,d tesLY2 <br />r if the entire depth of the sump is not tested, specify how much was tested, If the answer to aily of the questions hidieuled with all <br />asterisk (•) is "NO" or "NA". the entire sump must be tested. (See SWRCB LO -160) <br />