My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vv I vv at•IUI—' aa.vau •aYN(1 WVSVW A afVV& l Vl i 1UU <br />SWRCB, January 2002 page _� of Z_ <br />6- PIPING BUMP T&=G <br />Test Method Developed By; Sump Manufacturer J22dustry Stas Proressiontal Engineer <br />Other (5 ecj&) <br />Test Method Used: Pressure Vacuum r <br />Other (S�vee�) <br />'1"naf Fn &;nin of I t40A' `i -L, . Euuidment Resolution: <br />Sump Diameter: <br />.�'lYIItl1 g7v✓t +� <br />q g 4 <br />Suitt]) # Sump P <br />Sump # <br />Sump Depth: <br />7 <br />Sump Material: <br />P <br />Height from Tank Top to Top of <br />Hi hest Piping Penetration: <br />Z <br />Height froth Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />PoRion of Sump Tested' <br />f }at» f <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water ?0 <br />No NA <br />Yes No NA Yes No NA <br />Yes No NA <br />Turbine shutdown response time <br />is system programmed for fail-safe <br />shutdown?' <br />49jP No NA <br />Yes No NA Yes No NA <br />Yes No NA <br />Was fail-safe verified to be <br />o erational7' <br />acp No NA <br />lies No NA Yes No NA <br />Yes No NA <br />Wait time between applying <br />pressure/vacuutn/water and starting <br />test: <br />31t)O ;, v, <br />Test Start Time: <br />Initial Reading (R,): <br />�. <br />Test End Time: <br />Final Reading (RIP): <br />Test Duration: <br />Change in Reading (RF -W): <br />I A"; on _ <br />, vo <br />Pass/Fail Threshold or Criteria: <br />6, Z <br />Test Result: <br />Pass Q pail <br />Q Pass 0 Fail D Pass 0 Fall <br />❑ Pass O (rail <br />Was sensor removed for testing? <br />No NA <br />Yes No NA Yes No NA <br />Yes No NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />No NA <br />Yes No NA Yes No NA <br />Yes No NA <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to aUi of the questions indicated With an <br />asterisk ('t) is "NO" or "NA". the entire sump must be tested. (See SWRC13 LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.