My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..� +., u.. a + a v..+•+ a +. v+.+ -4111 vwevuwva A V1% <br />b <br />SWRCS. January 2002 <br />L UU <br />Pago _L. ol'3 <br />Test Method Developed By: <br />Piping Manufacturer uatry Standar - Professional Engineer <br />Other.. pacify) <br />_ <br />Test Method Used:ssure <br />.- <br />vacuum Hydrostatic <br />Other (5pecif <br />Test Equipment Used; <br />Equipment Resoiutiun: <br />PlpIngRan#jZ <br />Piping Run W75'' Piping Run N <br />Piping Run # <br />Piping Material: �P <br />FRP <br />Piping Manufacturer: <br />5" 4411 <br />c"" <br />Piping Diameter: <br />w <br />'3" <br />Length of Piping Run: <br />/5-U , <br />14f . <br />Product Stored: <br />e)z- x A-0- <br />7 Oe-* 4 p—x <br />Method and location of <br />i in -run isolation: <br />7 • <br />, <br />--7 <br />Wait time between applying <br />preesurdvacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (RO:��" <br />/laS� <br />sSr �,S• <br />Test End Time: <br />- <br />Final Reading (RF): <br />tri"tbs. <br />Test Duration: <br />/ ✓ . <br />/ A <br />Change in Reading (RF-Ri): <br />6 /6:r, <br />G 1&.5 <br />pass/Fail Threshold or <br />U /L�g <br />o, U /6S <br />Criteria: <br />'coat aewult! <br />I t arras$ ❑ Fail <br />Puss 0 Fall O Pass 0 Fail <br />0 Pass D Fail <br />Comments (Include fnforrrrallon onrepairs mads prior la Iassir�rd recomnienddylollux-u1� nrfitNec/ Ivsls) <br />
The URL can be used to link to this page
Your browser does not support the video tag.