My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 2:56:37 PM
Creation date
6/23/2020 6:57:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aug ,16 12 12:33p Reliable PetroleurnA 209-845-8953 p,16 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Sub it minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed.. YES[I No <br /> 2. Submit copies of IC C Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or sting any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available or the jobsfte as required by Title 8. <br /> 3. Detailed descriptior of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing lo( tion of repairs and/or replacements. If repairing a component, describe how this win be done. (if <br /> adding piping, UDC , or other UST equipment, or pbrfbrming tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necesL ry for a timely plan review}: <br /> cl PL L <br /> -VSAA <br /> J44 9k--t415aP=±U& <br /> 4. List of equipment to 1**used(Attach manufacturer's specification sheets showing third-party approval): <br /> L lL I-) <br /> -7� <br /> '#ci r~�3—2z <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.