Laserfiche WebLink
FW5 10 11:40a Arco AMPM 2098 -Pl <br /> UNDERGROUND STORAGE TANK APR 0 5 <br /> RESPONSE PLAN- PAGE 1 (OUL per facility) <br /> OF Mm J17",, Rol <br /> TYPE OF ACTION 0 1 NEW PLAN 0 1 CHANGE OF INFORMATION ",!,"J(,CIJNTY <br /> iAL <br /> 1. FACILITY INFORMATION HEA <br /> LT"'L' '-euRTMENT <br /> FACILITY ID 9 (Agency Use On& <br /> BUSINESS NAME(S F NAME) RC2. <br /> C22L <br /> BUSINESS SITE R04. <br /> ..........1`431�� <br /> 11. SPILL CONTROLND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST;;il-ms and supplements the emergency response plans and procedures in the Facility's Hazardous Materials <br /> Business Mo. <br /> If safe to do So,tilciliLy personnel will take immediate measures to control or stm any release activate pump shut_ol'f,etc.)and,if necessary,safely remove <br /> remaining hani-douti material from the UST system. <br /> > Any release to secondary containment will be pumped or other-wise removed within a time consistent with the ability of the Secondary containment system to <br /> coritair the hazardous material,but not greater than 30 calendar days,crooner if required by the local agency, Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> Absorbentmaterial will be used to contain and clean up manageable spills of hazptdous materials. Absorbent material which ling becorne too saturated to be <br /> efFQctivQ or which is no longer intended for use.will be manWrl as hazardous waste unless a-masta determination in accordance with 22 CCR§66262.1 l firids that <br /> it Is non-hazardous Used aasorbent mulaial. reumbJe or ivame,will be stored in a properly labeled and sea Lf4_cnn(U_e_r. Waste material shall he disposed <br /> appropriately. <br /> > Facility personnel will determine whether any water removed horn secondary containment SYSImns,or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous caste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that itisnon-1ta2ard&us. If the water has a petroletim sheen 4 i.e.,rainbow colors).,it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. 'Weer(hazardous or non-hazardous)from sumps,spflI containers,etc.will not be disposed to storm water systems. <br /> We will review secondary containment systems for possible deterioration if arty of the following conditions occur: <br /> I. Hazardous material in contact with secondusy containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone To damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3. Hazardous meterial.other than the product/wastc stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released procluettwaste,and the addedmaterial or resulting material from such acombinition is not compatible with secondary containment <br /> IH. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-tip equipment kept permanently on-site is listed in the facility's Hazardous Materials Business plan. This <br /> equipment is inspected at least montly,and after each use,Supplies are replenished as needed. Defective equipment is repaired orrephiced as necessary. <br /> E2131PMENT NOT PERMANENTLY Oil-SITE.BUT AVAILABLE FOR USE IF NEEDED- (Complete only,ifapplicable) <br /> EQUIPMENT LOCATWK AVAILABILITY <br /> RID. R20, <br /> �a u4 'I.L JUDL <br /> R2L R31. <br /> R11 M2. R32. <br /> R13. R23. W-3. <br /> R14 R24. <br /> R15. R25. <br /> IV- RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONS)]VARERIUSPONSISLE FOR A1JTF1OjtI7d1VGAJXY WORK NF4CESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40, TITLE -- <br /> R <br /> Z)w Ke,0_ 7337 <br /> MAY41E R4 1. TITLE <br /> 0 <br /> NAME V <br /> 1Z TrTLY R52 <br /> NAME Vcele TITLE . <br /> V. MONITORING MICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNA <br /> 9THORJZED RELEASE,STEPS To VERIFY TjqE RELEASE AVILL BE MADE AS FOLLOWS: <br /> E:Additional system testing or data colieetionV1rispection by qualified persons DRecalibration ofequipment <br /> Other: <br /> UST R0139fise Plan MOOS)-IJ3 <br />