Laserfiche WebLink
Mar 29 10 09:10a Arco AMPM 2098308293 p.1 <br /> WIMIJ 101, M <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN — PAGE 1 (One form per facility) <br /> TYPE OF ACTION 0 L NEW PLAN [{ 2.CHANGE OF INFORMATION Rot. <br /> I. P`ACILITY INF® TION <br /> FACILITY ID# (Agent}•Om On.) _ <br /> BUSINESS NAME(S eF O141�Y NAME} �� R,n. <br /> BUSINESS SITE ADDRES�_'"—— ? R03. CITY Rat. <br /> 3 <br /> II. SPILL CONTROL ND CLEANUP METHODS <br /> 1 This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the tncility's Hazardous Materials <br /> Business Pian. <br /> i If safe to do so,facility personnel will rake immediate measures to control or stop any release(e.g.,activate pump shut-olY;etc.)and,if necessary.safely remove <br /> remaining hazardous material from the UST system. <br /> > Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> certain the harardous material,but not greater than 30 calendar days,or sooner if required try local agency, Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> i Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent ma¢eria€ which has become too saturated to be <br /> effective or which is no longer intended for use wit[be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. used absorbent material,reusable or wastc, will be stated in a properly !abated and 2Lalgd con B <br /> appropriately. itter Waste material shall be disposed <br /> > Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up,ac'jvi h",.bea.n im-,"'d "t v t any <br /> ltaitardous rnateriat,If the water is contaminated,it tvitI be managed as hazardous waste unless a waste def i rr)'a 7ti 22� 2.1 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A tE i leu yer agtI "isplay <br /> rainbow colors, Water(hazardous or non-hazardous)from sumps,spill containers,etc,wilt not be disposed t s <br /> b We wiNi review secondary ctnttairxtlern systems for possible deterioration if any of the following conditions <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prate to damage from any equipment used to remove or cleanup hazardous material collect nment; <br /> 3. Hazardous material,other than the productrwaste stored in the primary containment system,is placed inside soco ry containment to treat or neutralize <br /> released produotAvaste,and the added material or resulting material from such a combination is not compatible with secw da co ti�R4 <br /> III. SPILL CONTROL AND CLEAN—UP EQUIPME �►l1, ' T <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the tacilit3's H ria s Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary, <br /> EQUIPMENT NOT PERMANENTLY 0N, -SITE,BUT AVAILABLE FCom Ictc ottiv ifa applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. <br /> R20. R3Q <br /> Rtl. R2 r. ' R31. <br /> R22 R22 <br /> R32. <br /> RI3. <br /> 11.23. R33. <br /> R34. R24. <br /> R34_ <br /> Ria. R?S <br /> 1135. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONIS)MIARE RESPONSIBI FOR AUTHORIZING ANY wORK N ECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME <br /> RIO. TITLE RSQ <br /> NAMI, R41. TITLE <br /> NAME W h"Q f <br /> t R-2 TITLE <br /> R5« <br /> NAME V " TITLE <br /> R53. <br /> V- MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional system testing or data collection ❑Inspection by qualified persons ❑Recalibration of equipment <br /> Other: <br /> UST Response Plan(312008)-113 <br />