Laserfiche WebLink
SAN JOAQUIN11COUNTY ENVIRONMENTAL HEALTH ARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITOPJNG PL -PAGE I <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION M01. <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFO TION <br /> FACILITY ID#(Agency Use Only) - - <br /> FACILITY NAME ARCO#06347 M03. <br /> FACILITY SITE ADDRESS 2430 JOE PONMO PKWY M°4' CITY TRACY M05. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY El99.OTHER(Specify): MoM07. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM Mu. <br /> PANEL MANUFACTURER: Veeder Root M12. MODEL#: US 350 M13. <br /> LEAK SENSOR MANUFACTURER: Veeder Root M14. MODEL#(s): 794390-409 M15. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: Mn. <br /> IN-TANK PROBE MANUFACTURER: Mls. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ &CONTINUOUS ❑ b.DAILY/AIIGHTLY ❑ c.WEEKLY M20 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M27. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ 99.OTHER(Specify): M28 <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: Veeder Root M32. MODEL#: TLS 350 M33. <br /> LEAK SENSOR MANUFACTURER: Veeder Root M34. MODEL#(S): 794380-208 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ® a.YES ❑ b.NO M16- <br /> WILL FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M37. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): VAPORLESS(91 tank) M38. MODEL#(S): LD2000(91 tank) M39. <br /> [0 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: RED JACKET M4o. MODEL#: CPT M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: E] a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M43. <br /> WILL ELLD FAILUREMISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M47. <br /> •Requires agency approval S8 Allowed for monitoring ofunburied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> El99.OTHER(Specify) M48. <br /> ARCO#06347,Belshire Environmental Services 115 <br />