Laserfiche WebLink
PgUIN <br />�o.• '�.coG SAN JOAQUIN COUNTY <br />ri .r—Tcrr—: <br />Z ENVIRONMENTAL HEALTH DEPARTMENT <br />y? 600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjclov.org/ehd <br />q�/FORS <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />-7/ I <br />V <br />❑ mechanical Model: <br />1 <br />Facility /IA,�ddress: <br />2�11/o <br />Service Request #: Q <br />Onsite Service TechniciName: <br />Leak detector <br />❑ <br />ICC Service Technician/Installer Exp. Date: <br />Manufacturer Training: <br />❑ electronic Serial #: <br />`�r``// <br />❑ line test programmed <br />ll l0 n <br />IVP, Q'p <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />rCold <br />❑ <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />6 <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware.that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />start of monitoring panel <br />rCold <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />EHD 23-04 <br />Rev 11/17//08 <br />a <br />UST SERVICE REQUEST INSPECTION REPORT <br />%i <br />EHD 23-04 <br />Rev 11/17//08 <br />a <br />UST SERVICE REQUEST INSPECTION REPORT <br />