Laserfiche WebLink
SWRCB, January 2002 <br />0 Page 3 . <br />I R 1 <br />5. SECONDARY <br />PIPE TESTING <br />Test Method Developed By: <br />Tank Manufacturer <br />Industry Standard F] Professional Engineer <br />Other (Spec) <br />Test Method Used: <br />❑X <br />Pressure <br />Vacuum Hydrostatic <br />Other (Spec) <br />Test Equipment Used: gauge <br />Equipment Resolution:. 2 Ops i <br />Piping Run # 6 PRE A <br />Piping Run # 6 PRE B Piping Run # <br />Piping Run # <br />Piping Material: <br />dw flex <br />dw flex <br />Piping Manufacturer: <br />environ <br />environ <br />Piping Diameter: <br />211 <br />211 <br />Length of Piping Run: <br />1601 <br />1601 <br />Product Stored: <br />PREMIUM <br />PREMIUM <br />Method and location of <br />sump <br />sump <br />piping-run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />5min <br />5min <br />starting test: <br />Test Start Time: <br />8:50 <br />8:50 <br />Initial Reading (RI ): <br />5psi <br />5psi <br />Test End Time: <br />9:50 <br />9:50 <br />Final Reading (RF ): <br />5psi <br />5psi <br />Test Duration: <br />lhr <br />lhr <br />Change in Reading (RF -14 ): <br />0 <br />0 <br />Pass/Fail Threshold or <br />0 <br />0 <br />Criteria: <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />