My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 11:25:26 AM
Creation date
6/23/2020 6:58:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507204_2360 W GRANT LINE_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />SECONDARY LINE TESTING <br />Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: • Pressure o vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br />Description Line #5 Line#6 <br />Tank product <br />Gasoline - 91 - E <br />Gasoline - 91 - W <br />Pipe manufacturer <br />Environ <br />Environ <br />Pipe material <br />Poly <br />Poly <br />Primary pipe diameter (inches) <br />1.5 <br />1.5 <br />Secondary pipe diameter (inches) <br />2 <br />2 <br />Method of secondary pipe isolation <br />Co -ax Fitting <br />Co -ax Fitting <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />100 <br />110 <br />(include length of branch runs) <br />Wait time for pressure to stabilize (hr:min) <br />0:10 <br />Test start time <br />11:30 AM <br />Initial pressure (psig) <br />5.0 <br />Test end time <br />12:30 PM <br />Final pressure (psig) <br />5.0 <br />Test duration (hr:min) <br />1:00 <br />Change in pressure (psig) <br />0.0 <br />Pass/Fail threshold (prig) <br />0.5 <br />TEST RESULT <br />PASS <br />Comments: <br />10 2006 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.