Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490.1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> 7-Eleven# 32262 <br /> BUSINESS SITE ADDRESS 2360 Grantline 103. CITY Tracy 104. <br /> II. EQUIPMENT TESTING AND PREVENTIVE,MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel.[23 CCR§2632,2634,2638,26411 <br /> MONITORING E UIPMENT IS SERVICED ® 1.ANNUALLY 99.OTHERS iq' 490-34 <br /> Q ❑ ( �V)� 490.36. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,26341 490-4. <br /> IV. TANK MON TTORING IS PERFORMED USING THE FOLLOWING METAOD(S) (Check all <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490.5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder-Root 490-7 MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-9. MODEL#(S): 302 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. OTHERc <br /> (S1>eY)� 49 <br /> if 4v°-18. <br /> _ ❑ c. _ 0-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 490-20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: E] a.36 HOURS ❑ b.60 HOURS 49021. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify) 4 -25 <br /> 90 . <br /> ® 99.OTHER(Specify): Overfill protection-Flapper 490-26. <br /> 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METIOD(S) t(Cht k all <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [§26361 SECONDARY CONTAINMENT IS: ® a.DRY E] b.LIQUID FILLED ❑ c.PRESSURIZED Eld.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:Veeder-Root 490-30. MODEL#: TLS-350 K 490-31 <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-32 MODEL#(S): 352 STP 1208 fill sumps 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S):Vaporless(91&87)1 FE Petro(89) 490-37. MODEL#(S91D LD 2000/MLD(89) ago 38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490.41 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> ❑ 4.PIPE INTEGRITY TESTING. -----.�-- - ----------490=0-5.. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ® c.OTHER(Specify) SB 989 every 36 mo. 490 46 <br /> _ _ 490.0-7. <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> •Allowed for rwnitoxing of unburiedemergenry generator fuel piping only per HSC 2§5281.5(6X3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3p 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51 <br /> ❑ <br /> 99.OTHER(Specify) 49 4?0- <br /> 490-32. <br /> UPCF UST-D(12/2017)-1/4 www.unidoes.org <br />