Laserfiche WebLink
REGLIVEL <br />F. In -Tank Gauging / SIR Equipment: F' Check this box if tank gauging is used only for invent - <br />r_1 <br />016 <br />r Check this box if no tank gauging or SIR equipment is i <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. ENVIRONMENTAL <br />Complete the following checklist: <br />rw Yes <br />�: No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />G- Yes <br />01D No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Yes <br />�� No* <br />Was accuracy of system product level readings tested? <br />Gr Yes <br />r No* <br />Was accuracy of system water level readings tested? <br />+' Yes <br />r No* <br />Were all probes reinstalled properly? <br />+ Yes <br />No* <br />ere all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ri Check this box if LLDs are not installed. <br />Complete the following checklist: <br />(* Yes <br />r No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? (Check all that <br />apply) Simulated leak rate 3 g.p.h.; r! 0.1 g.p.h; i" 0.2 g.p.h. <br />N/A <br />Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />No* <br />Was the testing apparatus properly calibrated? <br />i Yes <br />IT No* <br />For mechanical LLDs, does the LLD restrict product Flow if it detects a leak? <br />6 N/A <br />( Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />im Yes <br />rV No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />001, N/A <br />It YesI'P <br />No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />monitoring system malfunctions or fails a test? <br />N/A <br />Yes <br />0td1 No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />' N/A <br />Yes <br />r No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Page 4 of 4 12/07 <br />