Laserfiche WebLink
RE(;E!VtL) <br />SWRCB, January 2002 Page 1 of 1 <br />6. PIPING SUMP TESTING Z'li- <br />Test Method Developed By: F Tank Manufacturer P Industry Standard F Professional Engineer <br />F Other (Specify) 11 NV, <br />Test Method Used By: F Pressure F Vacuum 170 Hydrostalic t;-ru, ���" JR4 <br />F Other (Specify) <br />Test Equipment Used: VPLT <br />Equipment Resolution: 0.00001 in. <br />STP Containment for <br />Tank T4 RUL REG <br />UNLEAD - 1 <br />STP Containment for <br />Tank T5 MUL <br />MIDGRADE - I <br />STP Containment for <br />Tank T6 PUL <br />PREMIUM - 1 <br />Sump Diameter/Dimensions: <br />48 in. <br />48 in. <br />48 in. <br />in. <br />Sump Depth: <br />67.00 in. <br />63.00 in. <br />63.00 in. <br />in. <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />24.00 <br />23.00 <br />22.00 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />6.00 <br />9.00 <br />9.00 <br />Condition of sump prior to testing: <br />good <br />good <br />good <br />Portion of Sump Tested' <br />26 <br />25 <br />24 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />G Yes r No r NA <br />f* Yes r Nor NA <br />G Yes r No r NA <br />f Yes r No C NA <br />Turbine shutdown response time <br />02:00:00 sec <br />02:00:00 sec <br />02:00:00 sec <br />sec <br />Is system programmed for fail-safe <br />shutdown?* <br />G Yes r No r NA <br />C Yes r No r NA <br />ro Yes r No r NA <br />r Yes r Nor NA <br />Was fail-safe verified to be <br />o erational?* <br />r Yes r No r NA <br />0 Yes r No r NA <br />to Yes r No r NA <br />r Yes r No r NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test <br />5 min <br />5 min <br />5 min <br />min <br />Test Start Time: <br />10:06:00 <br />10:06:00 <br />11:53:00 <br />Initial Reading (Rj): <br />0.00000 in. <br />0.00000 in. <br />0.00000 in. <br />Test End Time: <br />10:36:00 <br />10:36:00 <br />12:23:00 <br />Final Reading (RF): <br />-0.00160 in. <br />-0.00190 in. <br />-0.00180 in. <br />Test Duration: <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF -RI) : <br />-0.00160 in. <br />-0.00190 in. <br />-0.00180 in. <br />Pass/Fail Threshold or Criteria: <br />+/-0.00200 <br />+/-0.00200 <br />+/-0.00200 <br />+/- <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Was sensor removed for testing? <br />r+ Yes r Nor NA <br />ro Yes r No r NA <br />Yes r Nor NA <br />r Yes r Nor NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />r; Yes r No r NA <br />C. Yes r No r NA <br />r Yes r No r NA <br />r Yes r Nor NA <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. <br />WO: 2324876 <br />