Laserfiche WebLink
j <br /> Page 1 of 8 <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: CHEVRON#208117 Date of Testing: 3/06/2013 <br /> Facility Address: 755 S.TRACY BLVD,TRACY,CA 95376 <br /> Facility Contact: I Phone: <br /> Date Local Agency Was Notified of Testing: 2/28/2013 <br /> Name of Local Agency Inspector(fpresent during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Wayne Perry,Incorporated <br /> Technician Conducting Test: NICK HARVEY ICC#5115738 <br /> Credentials: X CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester <br /> License Type: A,HAZ,C21,C10,B,C61,D40 License Number: 300345 <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> Fumished on request <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> 87 Annular ❑ ❑ [j87HI Bucket ® ❑ El El91 Annular ❑ ❑ ❑ 91 Fill Bucket ® ❑ ❑ ❑ <br /> 87 Prod Secondary Line ❑ ❑ ❑ 87 Vapor Bucket ® ❑ ❑ El <br /> 91 Prod Secondary Line ❑ ❑ ❑ 91 Vapor Bucket ® ❑ ❑ I ❑ <br /> 87 STP Sum ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 91 STP Sump ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 1 /2 ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 3 /4 E ® ❑ Ell Rl ❑ <br /> UDC 5 /6 E ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 7/ 8 ® I ❑ 1 ❑ ❑ ❑ ❑ ❑ <br /> UDC 9/10 ® ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 11/12 ❑ ❑ ❑ ❑ <br /> 87 Fill Sum ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 91 Fill Sump LiLiEl 1 1:11 <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> One(1) 55-gallon drum was left on site <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> a <br /> Technician's Signature: Date:_3/06/2013 <br />