Laserfiche WebLink
Page 1 of 1 <br /> SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Fill Riser Containment Sumps r <br /> Fill Riser Containment Sumps are Present, but were Not Tested <br /> Test Method Developed By: r Spill Bucket Manufacturerr Industry Standard 0 Professional Engineer <br /> r Other (Specify): <br /> Test Method Used By: r Pressure r° Vacuum 0 Hydrostatic <br /> r Other (Specify): <br /> Test Equipment Used: LAKE TESTEquipment Resolution: LO.0625 in <br /> s <br /> Spilt'Sox Afi Spill;Box11 <br /> Tank T i:- PREMIUM Tank T 2: REGUARpiil Box . Spin sox # <br /> Fill -Direct Fitl—Direct',n. ' <br /> Bucket Diameter: 12.00 12.00 <br /> Bucket Depth: 13.75 14.00 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min min m i n <br /> starting test <br /> Test Start Time: 12:40:00 10:10:00 <br /> Initial Reading ny,: 13.75 in. 14.00 in. <br /> Test End Time: 13:40:00 11:10:00 <br /> Final Reading(P,): 13,75 in. 14.00 in. <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading(a.,y): 0.00 in. 0.00 in. <br /> Pass/Fail Threshold or Criteria: +/- 0.00 +/- 0.00 <br /> Test R+esult.. PassP s s <br /> Comments? (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> r-- <br /> I <br /> I <br /> f <br /> i <br /> i <br /> i <br /> i <br /> i <br /> 1 <br /> I <br /> i <br /> 3 <br /> i <br /> E <br /> I <br /> WO: 2301932 <br />