My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2007-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:01:09 AM
Creation date
6/23/2020 6:58:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2013
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2007-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U i SAN.I A. COUNTY <br /> ENVIRONMEWAL HFALTH DEPARTMENT <br /> 600 <br /> E.Main St.,SP {Cion,CA 95202-3029 <br /> Te&pk6j,,,(209)468.3420 Fax:(209)468-3433 Web.'MBWXW–V—.0MA(f--b—d <br /> RETURN TO CONTIJANCE CERTIFICATION <br /> Any MWOR viol afiow no in the A'Ndtice to COMIY'® the attached Inspection Report must be <br /> 9M tedM— 3 0 rm must bsubm;itted to the <br /> gU& 4M of=cipt of this inspe4don. TWS oe cerfification.f <br /> Envijonmentgl lievith D QBHD)address at the top of this form vd35 days of mccipt of the <br /> Inspection Repoit <br /> All pmMtLijonR W_Qg=_viol aaons no in the anached Inspection Report or Coat tinuatilOn Form,Or <br /> disputes to any violations,are to be submitted using this certification and returned to EHD-Md�3 �da <br /> unless othmvise specified in the Inspection Report. <br /> Note- AD ERD staff time associated wilh faging to comply by the above not dates w1H be billed at <br /> the current our rate <br /> For this certifleation to be completethe operater of the site must include- <br /> s A statement documenting what corrective actions were taken or will be taken for each violation <br /> a Copies of sampler esultstm&uifests/iTainingrecords/other appropriate paperwork,and/or photos <br /> verifying corrections <br /> a Operator's certification <br /> In"otion Date: Inspected By:���� <br /> Facility Address: 'I L) �Vv-Ck(--� �3 EPA.!D#: - C�-�e C',M l 2-1 <br /> I cerfify under penalty of law that: <br /> 3. 1 have corrc=d the violations specified in the Inspection Report from the abov�mentioned <br /> inspection date. <br /> 1 1 have persanally examined the following documentation submitted as proof of compliance FOR <br /> EACH VIOLATION and I believe the information to be true,accurate,and complete: <br /> Photm 'Y' rk Statement <br /> 1 1 am authorized to submit fl3is certification an behalf of the Respondent. <br /> 4. 1 mn-aware that them am significant penalties for mibmitting false ifformation,including The <br /> p bility of a fine and/or ioment for im violations.(HSC 25191) <br /> .oss, own <br /> Nmme: Title; <br /> r <br /> Sign re. Date- 31 I(i� <br /> FHD 2202-005 Rev 08/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.