Laserfiche WebLink
0 0 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Pae 1 of 2) <br /> TYPE OF ACTION ® I.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> Chevron Station#208117 <br /> BUSINESS SITE ADDRESS 755 S. Tracy Blvd. 103. CITY .Tracy,CA 95376 104 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel.123 CCR§2632,2634,2638,26411 <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,26341 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that <br /> `ll) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 49-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6, <br /> PANEL MANUFACTURER: Veeder-Root 490-7. MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 990 MODEL#(S): 407 490-10. <br /> _._._._.....-- ---------------------- -- ------ -- ---------- - - ---- ---......_..._..._.-_._. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).123 CCR§26431 490-I1. <br /> PANEL MANUFACTURER 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS .DAILY/NIGHTLY U c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(Specify): 419. . <br /> g.p.h. _ g.p.h. ( P Y) 490-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 490-20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)123 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS ago 21. <br /> _ _ 490-22. <br /> 5. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23. <br /> TEST FREQUENCY: E] a.ANNUALLY ❑ b.BIENNIALLY [I c.OTHER(Specify): 4900-920520-. <br /> -- <br /> ❑ <br /> 99.OTHER(Specify): 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) Ih h ack 111 <br /> ® I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [23 <br /> SECONDARY CONTAINMENT IS: ® a.DRY [Ib.LIQUID FILLED ❑ c.PRESSURIZED El d.UNDER VACUUM ago-29. <br /> PANEL MANUFACTURER:Veeder-Root 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-32. MODEL#(S): 352 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ---- ----------- ---- ------- ------ - -- --- -- <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> MLLD MANUFACTURER(S): 490'32 MODEL#(S): 490-38. <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S):Veeder-Root 490-0-0' MODEL#(S):PLLD 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-4. <br /> ------ ------------ ------- <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> TEST FREQUENCY: El4 <br /> a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4940.46. <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> Allowed for mmLawingof unburied emergency generator fuel ping_oniy per HSC 25281. )Q <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.123 CCR§2636(a)(3)l 490-50. <br /> --- - -- -------- -- -- ---------------- <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> ❑ <br /> 99.OTHER(Specify) 490-10-sz. <br />