Laserfiche WebLink
L <br /> MAR 2 8 2016 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Industry Standard El Professional'Engineer <br /> F]Other(Specify) <br /> Test Method Used: (Z]Pressure ❑Vacuum E]Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: PSI <br /> ONE,=, <br /> . Piping Run#87 Piping Run#91 Piping yrsRun# Piping Rss un# <br /> LIN <br /> '011,WE, <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Appx 200' Appx 200' <br /> Product Stored: 87 91 <br /> Method and location of <br /> iping-run isolation: l I Test Boot in Sump Test Boot in Sump Test Boot in Sump Test Boot in Su <br /> p <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 8:53am 8:53am <br /> Initial Reading(RI): 5 PSI 5 PSI PSI PSI <br /> Test End Time: 9:53arn 9:53arn <br /> Final Reading(RF): 5 PSI 5 PSI PSI PSI <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ElPass ElFail OPass 0 Fail ElPass OFail OPass ElFail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />