My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:06:08 AM
Creation date
6/23/2020 6:58:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2014-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r°n <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING MAR 2 82016 <br /> Test Method Developed By: ❑UDC Manufacturer ®Industry Standard ❑Prue Tonaingmeer <br /> ❑Other(Spec) <br /> s ._« x 4 a } <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: Inches <br /> UDC# 9/10 UDC# 11/12 UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: Fiberglass Fiberglass <br /> UDC Depth: 32" 32" <br /> Height from UDC Bottom to Top 10^ 101. <br /> of Hi hest Piping Penetration: <br /> Height from UDC Bottom to 5^ 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> Fair Fair Fair Fair <br /> testing: <br /> Portion of UDC Tested Above highest penetration Above highest penetration Above highest penetration Above highest penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both N/A N/A N/A N/A <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes ❑No M NA ❑Yes ❑No Q NA ❑Yes ❑No ®NA ❑Yes ❑No Z NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No p NA ❑Yes ❑No p NA ❑Yes ❑No ®NA ❑Yes ❑No p NA <br /> o erational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test <br /> Test Start Time: 12:59pm 12:56pm <br /> Initial Reading(R,): 1.57215 Inches 1.06696 Inches Inches Inches <br /> Test End Time: 1:14pm 1:11pm <br /> Final Reading(RF): 1.57218 Inches 1.06691 Inches Inches Inches <br /> Test Duration: 15 mins 15 mins 15 mins 15 mins <br /> Change in Re ding(RF-R,): 0.00003 0.00005 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: p Pass ❑Fail p Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ®Yes ❑No ❑NA ®Yes ❑No ❑NA ®Yes ❑No ❑NA p Yes ❑No ❑NA <br /> Was sensor properly replaced and ®Yes ❑No ❑NA [3 Yes ❑No ❑NA m Yes ❑No ❑NA p Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.