Laserfiche WebLink
• • -aa • - a e a • a <br /> 1157F,/ � \a <br /> acuity/5ii�e <br /> CHEVRON#208117** CERS ID <br /> 55 S TRACY BLVD 10182313 <br /> RACY,CA 95376 UST Tank# <br /> TA0508092 <br /> P10 ii ordtoringisperforrnett Usingtt a Foiiowing Methods , <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry VEEDER-ROOT VEEDER-ROOT <br /> Panel Model# Leak Sensor Model# <br /> TLS-350 794380-352 <br /> Yes Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes Failure/Disconnect Triggers Pump Shutdown <br /> --...................._...._.............................................._..........<._........____.................................._........................................................_........_.................._ ..._.................. .......... ....... <br /> Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> ..................._.._............_..............................._......................................_......................_.._........................._....................._._._.............................__...............................................-....................................................._......... <br /> Yes Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> ELLD Manufacturer.. ELLD Programmed in-Line Testing ELLD Triggers Automatic Pump Shutdown <br /> EEDER-ROOT Yes <br /> LLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> LLD Yes <br /> Pipeline Integrity Testing Visual Pipeline Monitoring <br /> Pipeline integrity Testing Frequency Visual Pipeline Monitoring Frequency <br /> Suction Piping Meets Exemption Criteria <br /> No Regulated Piping Per Health and Safety Code,division 20,Chapter 6.7 Is Connected To The Tank System <br /> Other Pipeline Monitoring <br /> nder Dispenser Cbii ainrnent{UCfC)Montton <br /> „. <br /> DC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> Continuous Yes <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> DC Panel Manufacturer Yes <br /> EEDER-ROOT Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> DC Panel Model# Yes <br /> LS-350 UDC Monitoring Stops Flow of Product at Dispenser <br /> DC Leak Sensor Manufacturer Yes <br /> EEDER-ROOT UDC Construction <br /> DC Leak sensor Model Single-walled <br /> 94380-208 UDC Secondary Containment Monitoring <br /> Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br /> i _.. ... _. _.. ............ <br /> ELDTesting <br /> Yes Secondary Containment Testing <br /> Yes Spill�6ucket Testing ....._.........:. _...... .............. ,__--___...._..... <br /> Printed on 3/31/2015 6:51 PM <br />