Laserfiche WebLink
Feb. 6. 2014 9:53AM <br />6. PIPING SUMP TESTING <br />No. 3819 P. 6 <br />6 <br />Test Method Developed By: ❑ Sump Manufactiirer Industry Standard ❑ Professional Engmeer <br />❑ Other (Spec6) F <br />Test Method Used: ❑ Pressure ❑ Vacuum ®hydrostatic <br />❑ Other (Spec6) <br />#Testuipment Used: See attached testing procedures P t -P <br />Sump # Sump # <br />Diameter: 14 eK,►.� <br />Equipment Resolution:RT <br />Sump # Sump # <br />Sump Depth: <br />-7 T <br />Sump Material & Manufacturer: 4- ° J <br />Height from Tank Top to Top of <br />Highest Piping Penetration: 12 <br />Height from Tank Top to Lowest <br />Electrical Penetration: '� �7f <br />2-7 <br />Condition of sump prior to testing: <br />at <br />Portion Of Sump Tested' Above highest <br />enetration <br />Above highest <br />enelratlon <br />Above highest Above highest <br />Penetraftn penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑ Yes ❑ No ® NA <br />product and water)f <br />❑Yes Q No ®NA <br />QYes ❑ No ® NA ❑ 'Y'es [:1140 ® NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?' ❑ yes No ®NA <br />❑Yes ❑ No ®NA <br />❑Yes ❑ No ®NA ❑Yes [:1No ®NA <br />Was fail-safe verified to be <br />operational?' ❑ Yes ❑ No ® NA <br />[—]Yes ❑ No ® NA <br />[)Yes ® No ® NA ❑ Yes [j No ® NA <br />Wait time between applying <br />pressure/vacuum/water and starting 30 minutes <br />tes t: <br />30 minutes <br />30 minutes 30 minutes <br />Test Start Time: <br />Initial Reading (R.): <br />Test JEnd Time: <br />Final Reading (Rr): 9 .5 <br />3 3 <br />Test Duration: 15 mire <br />15 min <br />15 min 15 min <br />Change in Reading (Rp-R,): z;> v <2 <br />_ e" 1) 00 J <br />Pass/Fail Threshold or Criteria: 0.002 <br />0.002 <br />0.002 0.002 <br />.'. "' p.A86.' : ' :.: Fail .', <br />I! 89� - ❑)FAiy ' <br />. Q Q P$il'" :. Q' p$s9., ' • ❑ Fi1: <br />Was sensor removed for testing? ® Yes ❑ No ❑ NA <br />®Yes Q No ❑ NA <br />®Yes ❑ No ❑ NA ® Yes Q No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? ®X� ®No E)NA <br />®Yes ❑ No ❑ NA <br />®Yes [:]No ❑ NA ®Yes ❑ No ❑ NA <br />Comments — rnclude information on repairs made prior to testing, and recommended follow-up for failed tests) <br />t If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />actPrick (*) is "Wo." nr "NA"� the P.htirP e�imt� )ICt �1P iPCfPd. (See SWRC$ LG -160) <br />Received Time Feb. 6.'2014 9:59AMmNo.5138 <br />�- <br />