Laserfiche WebLink
Feb. 6. 2014 9:53AM <br />9. SPILL/O'VERFYLL CONTAYNMEN'T BOXES <br />No. 3819 - P. 8 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Presont, but were Not Tested ❑ <br />79 0 6 2 <br />Test Method Developed By: <br />❑ Spill ]Bucket Manufacturer Industry Standard ❑ Pro <br />❑ Other (Sped) <br />ineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Sped) <br />❑ vacuum <br />® Hydrostatic <br />Test Equipment Used: See attached testing procedures <br />Spill Box # <br />Bucket Diameter & Brand: <br />]Equipment Resolution: <br />Spill Box # i Spill Box tl V'6 <br />:?/ Spill Box # Vd <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />','ei <br />g : <br />9.' u v <br />•' vv <br />Initial Reading (Rj): <br />Test End Time: <br />o_•oo <br />�o,•pa <br />o _•d p <br />�� : a p <br />Final Reading (RF): <br />Test Duration: <br />45 -tit- l <br />/ <br />' 1 <br />Change in Reading (Rr-Rt): <br />C-) <br />e--> <br />U <br />Pass/Fail Threshold or <br />Criteria: <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />'est"sults,....: ..=..l,.-.:- <br />]Papa::>❑`aii`:';... <br />_ .. <br />_� <br />Comments — include information on re airs made prior to testing, and recommended follow-up for faired tests) <br />Received Time Feb. 6. 2014 9:59AM No,5138 <br />9-1 <br />