My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:09:31 AM
Creation date
6/23/2020 6:58:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508090_755 S TRACY_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> San Joaquin County JAN 17 2019 <br /> Environmental Health Department <br /> DIRECTOR <br /> 1Hazelton Avenue [��I r. b L ALTS <br /> .., Stockton, California 95205-6232 PROG <br /> R b t lion,izEHsCTR <br /> Jeff Carruesco,REHS, RDI <br /> vz <br /> Website: .sjov.or /ed Kasey Foley,REHS <br /> 209 46$-3420 Linda Turkatte, REHS <br /> Phone: <br /> ( ) Rodney Estrada,REHS <br /> Fax: (209)464-3433 Adrienne Ellsaesser. REHS <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> RETROFIT OR PIPINGI IT <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the <br /> applicant with comments. <br /> [] 2. Include a detailed site map on a separate sheet of paper showing all work to be done. Include the location of <br /> the tanks(s), piping, all tank-related appurtenances, streets, adjacent properties (north toward the top of the page), <br /> nearby septic tanks, leachfields, water wells, buildings, underground public utility lines (including water, sanitary <br /> sewer and storm sewer), and distance of piping from tank to dispensers. If underground utilities are not included <br /> on the site map, you must state in writing that USA Dig will be contacted prior to excavation activities. <br /> [] 3. Complete pages 3-6, "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR PIPING <br /> REPAIR PERMIT". NOTE: If sampling is required, sampling firm shall be an independent third party from the <br /> contractor performing the work. <br /> [] 4. Complete page 7, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> [] 5. Submit a completed"Service Request"form and"Underground Storage Tank Program Fee Worksheet". <br /> [] 6. If performing any excavation activities, and the facility is located outside of the city limits, submit a "Backfill <br /> Excavation Certificate" as required by the San Joaquin County Building Department. If a "Backfill Excavation <br /> Certificate" is required by any incorporated areas (cities), submit to the appropriate City Building Departments, <br /> pursuant to the Uniform Building Code STD 70-11. <br /> [] 7. The maximum review time for Plan Review is 15 working days from receipt of the adequately completed plan. If <br /> gross deficiencies are identified, an addendum will be required with a $130.00 per hour fee and the review will <br /> begin on the date of resubmittal. <br /> [] s. Advance inspection notice of at least 48 hours is required by the Environmental Health <br /> Department (EHD). <br /> [] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit (LEL) <br /> atmosphere and oxygen level), adequate number(s) and appropriate type(s) of fire extinguisher(s), and barriers to <br /> secure the area as necessary to minimize traffic and pedestrian interference. It shall be the project manager's <br /> responsibility for compliance with all health & safety regulations and requirements, including confined space <br /> requirements, which shall be strictly adhered to at all times during the course of the underground storage tank <br /> (UST) activities. <br /> [] 10. The EHD permit shall be on site during all UST permit-related activities. <br /> [] 11. Any changes in this document shall be approved by the EHD prior to initiating work. All changes to any work <br /> must be described in detail on pages 3 &4 and be shown on the detailed site map. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.