Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www sj.goy.ojehd <br />FACILITY NAME FACILITY CONTACT NAME <br />76 - Stockton Gateway <br />FACILITY ADDRESS SITE PHONE # WITH AREA CODE <br />322 S Center St. Stockton Ca. 95203 209-946-4592 <br />CITY <br />STATE ZIP CODE <br /># OF TANKS AT SITE <br />(209) 467-7573 <br />CA <br />ZIP CODE CIRCLE WORK TO BE DONE <br />APPLICANT BILLING NAME <br />APPLICANT CONTACT NAME <br />HMC - Henderson Maint Co <br />Carl W Henderson <br />APPLICANT MAILING ADDRESS <br />APPLICANT PHONE # WITH AREA CODE <br />PO Box 31325 - Stockton, CA 95213 <br />(209) 467-7573 <br />CITY STATE <br />ZIP CODE CIRCLE WORK TO BE DONE <br />CONTRACTOR ICC # <br />PIPING REPAIR FEE = $294 / FACILITY (use for piping, under -dispenser containment, ect.) <br />Closure Installation Repair Retrofit <br />ACTIVE FACILITY <br />TANK ID # (s): <br />CLOSURE FEE = $294 / TANK <br />2003 <br />2004 <br />2005 <br />2006 <br />2007 <br />2008 <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK (2002-2007) <br />$ I <br />PIPING REPAIR FEE = $294 / FACILITY (use for piping, under -dispenser containment, ect.) <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 98 / HOUR <br />SAMPLING INSPECTION FEE = $ 98/ HOUR <br />$550 FEE INCLUDES FACILITY FEE + 1 TANK <br />$125 PER TANK AFTER FIRST TANK <br />TANK PENALTY ASSESSED <br />TANK SURCHARGE = $15 / TANK <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM =$24.00/ FACILITY <br />PERMANENT CLOSURE <br />Removal or Permitted Closure in Place <br />TANK ID # (s): <br />CLOSURE FEE = $294 / TANK <br /># TANKS X $294 = <br />TEMPORARY CLOSURE <br />Plan Review and Inspections) <br />TANK ID # (s) : <br />TEMPORARY CLOSURE FEE = $294 / FACILITY <br />INSTALLATION PLAN CHECF <br />(Plan Check and Construction I <br />TANK ID # <br />PLAN CHECK FEE = $784 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s) : <br />TRANSFER FEE _ $ 20 <br />TANK RETROFIT REPAIR FEE = $294 / FACILITY (use for monitoring equipment, cold starts, EVR upgrades, <br />spill buckets, sumps, misc. <br />CONSULTATION FEE _ $ 98/ HOUR <br />$ I <br />PIPING REPAIR FEE = $294 / FACILITY (use for piping, under -dispenser containment, ect.) <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 98 / HOUR <br />MISCELLANEOUS <br />TRANSFER FEE _ $ 20 <br />CONSULTATION FEE _ $ 98/ HOUR <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 98 / HOUR <br />SAMPLING INSPECTION FEE = $ 98/ HOUR <br />ALL FEES ARE BASED ON THE $98 HOURLY RATE. TIME THAT EXCEEDS FEES PAID WILL BE BILLED TO APPLICANT. <br />OFFICE USE ONLY <br />