My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
322
>
2300 - Underground Storage Tank Program
>
PR0516472
>
COMPLIANCE INFO_2000-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 12:47:09 PM
Creation date
6/23/2020 6:58:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2009
RECORD_ID
PR0516472
PE
2361
FACILITY_ID
FA0012628
FACILITY_NAME
UNITED #5449
STREET_NUMBER
322
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14906111
CURRENT_STATUS
01
SITE_LOCATION
322 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516472_322 S CENTER_2000-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />Far Use 6),.141 Juriseliclions Within the State of'C'ulifbrnia <br />Awhorily C'ileef: C'halVer• 6, 7, Health caul Sc¢ehv C'ocle; Chapter 16, Division 3, Tille 23, Ccrlifbrnia C'ocle of'Regarla/iolr,s <br />This form must be used to document testing and servicing of mon'%nie ui inept. A se crate certification or report n1USY be <br />prepared for each monitoring system control panel by the technician wnpyof this form must be provided to <br />the tank sysn owner/operator. The owner%operator must submit arm cal agency regulatinf7 UST systems <br />within 30 days of test date. y <br />A. General Information SEP 2 4 2007 <br />Facility Name:, <br />ENV!Rqp�PUAT HEALTH <br />Bldg. No.: <br />Site Address:i1M60/ Gt Zip: /9`J <br />Facility Contact Person: Contact Phone No.: ( ) q�+ <br />Make/Model of Monitoring System: %� �'' Date of Testing Servicing: <br />B. Inventory of Equipment Tested/Certified <br />Cheek theappropriate boxes to indicates ed is equipment inspected/serviced: <br />d�� <br />Tanit ID:ging <br />Probe. Model: A446'r / <br />F <br />❑ In -Tank Gauging Probe. <br />Model: <br />e or Vault Sensor. Model• VD7 <br />❑ Annular Space or Vault Sensor. <br />Model: <br />/ Trench Sensor(s). Model: 20$ <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />nsor(s). Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />A Mechanical Line Leak Detector. Model: 79LD 'Z -00e' <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other (specify equi ment type and model in Section E on Pa a 2). <br />❑ Other (specify equipment t e and model in Section E Pa e 2). <br />Tank ID: / Anc-r <br />Tank ID: <br />In -Tank Gauging Probe. Model: AJ Afst t <br />❑ In -Tank Gauging Probe. <br />Model: <br />Annular Space or Vault Sensor. Model: <br />❑ Annular Space or Vault Sensor. <br />Model: <br />Piping Sump / Trench Sensor(s). Model: 24f� <br />❑ Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />9( Mechanical Line Leak Detector. Model: STP -171-D <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Other (specify a ui ment ty a and model in Section E on Page 2). <br />❑ Other (specify equipment t e and model i Section E on Page 2).Av- <br />Dispenser ID: % 4- - <br />Dispenser ID; -7-jf' <br />J Dispenser Containment Sensor(s). Model: <br />J4 Dispenser Containment Sensor(s). <br />Model: <br />Shear Valve(s). <br />12( Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and <br />Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />Dispenser Containment Sensor(s). Model: <br />Dispenser Containment Sensor(s). <br />Mojel--Zlfs <br />Shear Valve(s). <br />J KShear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dis enser Containment Float(s) and <br />Chain(s). <br />Dispenser ID: 777 <br />Dispenser ID: <br />2L Dispenser Containment Sensor(s). Model: <br />0 Dispenser Containment Sensor(s). <br />IR <br />Model: <br />it Shear Valve(s). <br />Shear Valve(s). <br />❑Dis enser Containment Float(s) and Chain(s). <br />❑ Dis enser Contaimnent Float(s) and Chain(s). <br />X11 the tacilrty contains more tanks or dispensers, copy this torn. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this <br />information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such <br />reports, I have also attached a copy of the report; (check all /hart apply): Syste -u -Im history report <br />Technician Name (print):-7Z4-Ajp Signature: " A' <br />Certification No.:w' 5 Z y; <br />License. No.: Ce _6ZEJ # *4 _5 U 7- <br />7& <br />Testing Company Name:_ �r�S )- Phone Ggo - p/z <br />Site Address:- Date of Testin/Servicing: 9 116107- <br />Page <br />16/07 <br />Page I of 3 03/01 <br />Monitoring System Certification <br />D. Results of Testing/Servicing <br />
The URL can be used to link to this page
Your browser does not support the video tag.