Laserfiche WebLink
E <br />5 WRCB, January 2002 Page 4of <br />6. PIPING SUMP TESTING <br />Test iMethod Developed By: 0 Sump Manufacturer U Industry Standard F] Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: ` Equipment Resolution <br />Sump-# <br />S"M #.- <br />JJj�.. <br />Sump <br /># <br />Sump Diameter <br />Sump Depth. <br />Sump F <br />Height from Tank Top to Top of <br />Highest Piping Penetration: ` t< <br />r <br />Height from Tank Top to Locest / <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />v <br />Portion of Sump Tested" <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑ Yes ❑ No ❑ NA <br />product and u"ater)?' <br />OYesPiq5o ❑ NA <br />[]Yes ,C No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe ❑ Yes ❑ Nd ❑ NA <br />shutdown `' <br />❑Yes ❑ No C NA <br />❑ Yes ❑ No 0 N <br />❑Yes LZ No ? NA <br />Was fain safe verified To be <br />operational?' ,,V" s ❑ No C NA <br />0 Yes ❑ No ❑ NA <br />❑ Yes E No ❑ NA <br />G Yes 0 N ❑ NA <br />Wait time betmveen applying <br />pressure/vacuum/water and starting _ <br />test: <br />Test Start Time: <br />J <br />Initial Reading (R4): s <br />Test End Time: <br />Final Reading (RF):, <br />b <br />g <br />Test Duration" , <br />r <br />Change in Reading (Rr-RI): <br />Pass/Fad Threshold or Criteria: <br />, <br />Test Result: Pass ❑ Fal <br />Pass ❑ Pain <br />❑ Pass ❑ Fail <br />11 Pass ❑ Fail <br />Was sensor removed for ? ..Yes L No ❑ NA <br />Yes ❑ No [INA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No [INA <br />Was sensor properly replaced and <br />, `g Yes u No ❑ NA <br />�-er�� functional � <br />KYeS ❑ No ENA <br />� Yes C ;'da ❑NA <br />IJ Y2S � Na O NA <br />er testing: �' <br />COmments — )include information on repairs made prior to testing, and recommended follow-up forfailed tests) f� <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "Na" or "NA", the entire sump must be tested. (See SWRCB LG -160') <br />