My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
322
>
2300 - Underground Storage Tank Program
>
PR0516472
>
COMPLIANCE INFO_2000-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 12:47:09 PM
Creation date
6/23/2020 6:58:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2009
RECORD_ID
PR0516472
PE
2361
FACILITY_ID
FA0012628
FACILITY_NAME
UNITED #5449
STREET_NUMBER
322
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14906111
CURRENT_STATUS
01
SITE_LOCATION
322 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516472_322 S CENTER_2000-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB, January 2002 Page (— of 8 <br />7. ER -DISPENSER CONT NT (UDC) TESTING <br />N <br />Test Method Developed By: ❑ UDC Manufacturer <br />❑ Other (S'necifv) <br />❑ Industry Standard—XProfessional Engineer <br />Test Method Used: ❑ Pressure ❑ Vacuum ,hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: �2 al i c��� <br />L L" t,, c/� ow A t <br />Equipment Resolution: "- <br />.. <br />UDC # 9 S/ 6 UDC # A E <br />'UDC # )UDC # j <br />UDC Manufacturer: <br />O p w <br />0 � <br />UDC Material: <br />l,- rs <br />UDC Depth: <br />3 <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />t <br />t` <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testint1 <br />Portion of UDC Tested <br />W ey cr , n , z <br />w e4-rr l,'r,,o t tvi <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />es El D NA <br />es D No ❑ NA <br />❑Yes ❑ o DNA <br />❑ Yes D Np DNA <br />product and water)?* <br />� <br />1 <br />Turbine shutdown response time <br />lid�.(c <br />Is system programmed for fail- <br />safe shutdown? <br />kes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑ Yes No ❑ NA <br />❑ Yes] o ❑ NA <br />Was fail-safe verified to be <br />o as fail-safe <br />D .Yes KNo 0 NA <br />❑ Yes 5&o D NA <br />❑ YesJ�No DNA <br />❑ Yes No ❑ NA <br />Wait time betweenja <br />Ling <br />pressure/vacuum/ d <br />starting test <br />/6 /-7,v(," <br />Test Start Time: <br />D <br />Initial Reading (RO: <br />i mac. fe. <br />Test End Time: <br />D ` 97 <br />o <br />/a <br />Final Reading (RF): <br />Avs--4- Gni <br />;r5 C [rc t'C. <br />Test Duration: <br />"'o <br />3 ® 'i n mo--(-_ s <br />Change in Reading (RF -RI): <br />a 'A q <br />Alb , -C. <br />Pass/Fail Threshold or Criteria:. <br />6 o r-� <br />,Cas ; 3jr-Fr- �°--I <br />Test Result:. <br />❑ Fail <br />[Pass ❑ Fail <br />Pass ❑ F '1 <br />0 Pass D ail <br />__APass <br />Was sensor removed for testing? <br />KYes D No ❑ NA <br />es ❑ No DNAIn <br />Yes D No ❑ <br />Yes D No NA <br />Was sensor properly replaced and <br />,l/Yes No ❑ NA <br />,Yes D No El <br />Yes ❑ No ❑ N <br />Yes ❑ No A <br />verified functional after testin 7 <br />\E <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the, questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.