Laserfiche WebLink
•S WRCB, January 2002 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard <br />❑ Other (Snecifv) <br />Test Method Used: ❑ Pressure " ❑ Vacuum hydrostatic <br />❑ Other (Spec) <br />Page �- of 8 <br />Engineer <br />Test Equipment Used: Ca 1 �V_)e L ijt a -A va 4, A t e <br />Equipment Resolution: , egi z- <br />UDC# 9S/6 UDC# eE/2.'UDC <br /># UDC# <br />UDC Manufacturer: O v�/ 0 <br />1 <br />UDC Material: <br />2, /�, S <br />UDC Depth: <br />Height from UDC Bottom to Top <br />of Hi est Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testin`r� <br />Portion of UDC Tested Wo, er Zr`c� z <br />Gt✓ r �. %i <br />Does turbine shut down when <br />UDC sensor detects liquid (both es ❑ No ❑ NAes <br />❑ No ❑ NA <br />❑ Yes ❑ o ❑ NA <br />❑ Yes ❑ N ' ❑ NA <br />roduct and water)?* <br />F. <br />Turbine shutdown response time y d Ick <br />raci.. <br />Is system programmed for fail- yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑ Yes No ❑ NA <br />❑ Yes o ❑ NA <br />safe shutdown? <br />Was fail-safe verified to be ❑ Yes KNo ❑ NA <br />❑ Yes f;�No ❑ NA <br />❑ Yes J�No ❑ NA <br />❑ Yes No ❑ NA <br />o erationalf <br />Wait time between a mg <br />pressure/vacuum/ ate d <br />starting test 16 -7 n w <br />e/®S <br />Test Start Time: /o;05— <br />Initial Reading Rj): i" c t rc. (c. <br />i r - i re r c - <br />Test End Time: D ` <br />© S <br />Final Reading RF): <br />c B rc tt. <br />Test Duration: - <br />-3 a n,.4-, 5 <br />Change in Reading (RF-Rj): a c- n <br />d -c- <br />Pass/Fail Threshold or Criteria: <br />Test Result: YPass ❑ Fail <br />fkrPass ❑Fail <br />ti Pass D F 'l <br />0 Pass EkFail <br />Was sensor removed for testing? KYes ❑ No ❑ NA <br />es ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />Yes ❑ No NA <br />Was sensor properly replaced and Yes ❑ No ❑ NA <br />,CYes ❑ No ❑ NA❑ <br />Yes ❑ No ❑ N <br />Yes ❑ NoA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to gnx of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />